BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 21, 2026

Site work and paving for a mixed-use development in Sharonville, Ohio. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; road / highway; and bridge / tunnel.

Question Deadline 02/26/2026 Bidder must submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows Email Project Manager, (Troy A. Niese), (tan@choiceoneengineering.com). If no response within 24 hours call (937-497-0200). Questions received less than 4 days prior to the date for opening of Bids may not be answered. The project involves repaving Cornell Road from Maple to Allenhurst. It also includes constructing a new sidewalk on the south side of Cornell from Parfour to Allenhurst. Additional work comprises the installation of a retaining wall, drive culverts, guardrail replacement, grading, and storm sewer work. All details regarding bid submittal, qualifications, procedures, and contract award are specified in the Instructions to Bidders contained in the Bidding Documents. Official notifications, addenda, and other Bidding Documents are available at the designated website. This Project Consists Op the Resurfacing of Cornell Road From Maple Street to Allenhurst Boulevard in the City of Sharonville, Hamilton County, Ohio. Sidewalk Will Be Installed on the South Side of Cornell Road From Parfour Court to Allenhurst Boulevard. Retaining Wall Construction, Drive Culvert Replacement, Guardrail Replacement, Storm Sewer, and Grading Work Will Also Be Performed. The Engineer's Estimate has been updated to $2,219,262.00 for the base bid and $2,250,542.00 for the alternate bid. The concrete cap of the existing sanitary sewer near proposed MH #4 may require temporary shoring or road repair for the width of the storm sewer trench. Similar to the retaining wall installation, temporary shoring for this concrete cap will be considered means & methods and incidental to the storm sewer. If road repair is necessary, it will fall under the contingent 253 bid item.

Bid Results

Roads / Highways

$1,789,740.00

Public - City

Paving, Site Work

83

8

16

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
129
Bidding Soon
2,693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

May 1, 2026

Project location map

Cornell Rd, Sharonville, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.