BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2026 at 7:00 PM

Updated February 12, 2026

Renovation of a mixed-use development in Santa Rosa, California. Completed plans call for the renovation of a playground / park / athletic field; and educational facility.

The project consists of the following: replacing five existing drinking fountains (two interior, three exterior) with new accessible H/L dual fountains with integrated bottle fillers; relocating restroom accessories and plumbing fixtures to meet accessibility clearance requirements; playground upgrades including replacement of basketball hoops and backboards; removal and replacement of the west play structure for TK along with the sandbox, installation of a new play structure with flush curb, pour in place safety surfacing, enhanced landscaping, new retaining wall, and ADA ramp improvements; replacement of the HVAC unit at the Room 17 Portable Building; electrical improvements including new lighting for egress or associated with other scope; replacement of composition shingle roofing on Building A2 with additional attic insulation; removal and replacement of sheet metal cap flashing with new standing seam clip and concealed wind clips; replacement of existing damaged fence in the northwest quadrant with new 6' high black vinyl clad chain link fencing and an ADA compliant gate; replacement of select fire alarm devices and installation of new ones, replacement of classroom smoke detectors with new smoke/CO detectors; fire riser repair and replacement of select riser equipment; and completion of the campus fire loop and addition of two new fire hydrants, new post indicator valve, and backflow preventers, including associated retaining wall and fence work. Interested subcontractors must submit bids by the specified deadline. Bids will be awarded based on best value criteria as permitted by law. Subcontractors’ licenses must be active and in good standing, and all registration, qualification, skilled workforce, and apprenticeship requirements outlined in California law must be met. All MEP and steel subcontractors must be prequalified. Contract documents are available for review by contacting GCCI, Inc.

Sub-Bidding

Educational

$3,000,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
409
Active Projects
217
Bidding Soon
2,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

April 19, 2026

Project location map

To be determined, Santa Rosa, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.