Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 21, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a civil project in McFarland, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Construction of a new municipal water supply wellhouse to include: o Masonry building o Well pump and associated mechanical piping o Chemical feed equipment o HVAC and plumbing o Electrical and instrumentation equipment Site work including paving and roadway construction, water main and sanitary connections, sewer lining, and outdoor standby power systems. SCADA and controls work to integrate the new water supply wellhouse into the Village's existing SCADA system. Bidders must be pre-qualified with the Village of McFarland within the last year or must be pre-qualified for this work 5 days prior to the bid deadline in accordance with Section 66.0901 of the Wisconsin Statutes. Each bidder must deposit, with his bid, security in the amount of 5% of the maximum bid amount. Bidders must be experienced in municipal pipeline construction. The Village of McFarland reserves the right to reject any and all bids and to waive informalities in any bid. This project will be funded by the Safe Drinking Water Loan Program (SDWLP) established under Wisconsin State Statutes, as administered by the Wisconsin Department of Natural Resources. Neither the State of Wisconsin nor any of its departments, agencies, or employees is or will be party to this invitation for bids or any resulting contract. Disadvantaged Business Enterprises (DBE), including minority business enterprises (MBE) and women business enterprises (WBE) are encouraged to apply and be used to the greatest extent feasible. Qualified DBEs will be included in the Unified Certification Program WisDOT UCP list. Program policy requires all bidders to show good faith efforts to solicit proposals from DBEs. Contractors with a DBE classification are strongly encouraged to bid as the Prime Contractor on this project provided they are qualified to do the work. Award of the contract will be subject to the Federal government's policy of good faith effort for increased use of DBE businesses. A description of the policy and forms to be used are included in specifications. Funding under the SDWLP program also requires all iron and steel products used in the construction of the project be produced in the United States (FFY 2014 Appropriations Act and/or Section 608 of the Federal Water Pollution Control Act (FWPCA)), including lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials The successful bidder will be required to conform to the wage requirements prescribed by the federal Davis-Bacon and Related Acts which requires that all laborers and mechanics employed by contractors and sub-contractors performing on contracts funded in whole or in part with federal funds in excess of $2,000 pay their laborers and mechanics not less than the prevailing wage rates and fringe benefits, as determined by the Secretary of Labor, for corresponding classes of laborers and mechanics employed on similar projects in the area, per the U.S. Department of Labor Wage and Hour Division May 29, 2009 Guidance. A pre-construction coordination will be held after contract execution. Each Contractor will be notified of the time, date and location of this conference. A representative of each Contractor shall attend this conference. Topics to be discussed will include expectations prior to Notice to Proceed, specifically engaging all subcontractors and submittal processing. A pre-construction conference will be held prior to construction. Each Contractor will be notified of the time, date and location of this conference. A representative of each Contractor shall attend this conference. QA date - 3-12-2026 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than five days prior to the date for opening of Bids may not be answered.
Award
Water / Sewer
$2,485,800.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2026
May 18, 2026
Multiple Locations, McFarland, WI
Related To This Project
McFarland, WI
--
McFarland, WI
--
McFarland, WI
--
McFarland, WI
--
McFarland, WI
Bid Date: Apr 02 2026
McFarland, WI
Bid Date: Apr 28 2026
McFarland, WI
Bid Date: Apr 20 2026
McFarland, WI
Bid Date: Apr 22 2026
McFarland, WI
--
McFarland, WI
Bid Date: Dec 17 2025
McFarland, WI
Bid Date: Nov 20 2025
McFarland, WI
Bid Date: Nov 20 2025
McFarland, WI
Bid Date: Nov 13 2025
McFarland, WI
--
McFarland, WI
Bid Date: Aug 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
