Site work and paving for a mixed-use development in McFarland, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Limit :Milwaukee St to Ih39/90 The roadway will be redesigned to improve roadway geometry; current and future operations; and improve safety by adding bicycle and pedestrian facilities. Intersection improvements will also be made. Modernization project to reconstruct approximately 5.5 miles of US 51 (Stoughton Road) from the WIS 30 interchange to I-39/90/94. There are 3 segments from the WIS 30 interchange to 8-39/90/94. This segment is for the early acquisition (3a) and is within the 1.2 miles. The roadway will be redesigned to improve roadway geometry; current and future operations; and improve safety by adding bicycle and pedestrian facilities. Intersection improvements will also be made. Right of way estimates, negotiation skills, ability and knowledge of recording legal documents, partial mortgage release and conveyances, the ability to secure necessary documents for the project (Statement to Construction Engineer, conveyances, Nominal Payment Waiver of Appraisal, W-9's, closing statements) access to READS, complete diaries for each parcel, capabilities to work through the Jurisdictional process if needed, ability to read TPP's, Exhibits, etc., the ability to order/complete appraisals if parcels switch from nominal to appraisal, knowledgeable and capable of handling the relocation appraisal, furniture/equipment/fixture appraisal, if needed. In addition, to the knowing the relocation process. Anticipated Construction Cost: $30,000,000-$34,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Madison - Deforest *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$34,999,999.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
576
Active Projects
371
Bidding Soon
2,514
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

US-51, McFarland, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.