Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2026 at 7:00 PM
Updated February 19, 2026
Site work and paving for a mixed-use development in McFarland, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Limit :Milwaukee St to Ih39/90 The roadway will be redesigned to improve roadway geometry; current and future operations; and improve safety by adding bicycle and pedestrian facilities. Intersection improvements will also be made. Modernization project to reconstruct approximately 5.5 miles of US 51 (Stoughton Road) There are 3 segments from the WIS 30 intercahnge to I-39/90/94. This segement is for 1.2 miles. A separate solicitation has benn provided for the early acquisition that will occur with 3 relocations that are located within these 1.2 miles. The roadway will be redesigned to improve roadway geometry; current and future operations; and improve safety by adding bicycle and pedestrian facilities. Intersection improvements will also be made. Right of way estimates, negotiation skills, ability and knowledge of recording legal documents, partial mortgage release and conveyances, the ability to secure necessary documents for the project (Statement to Construction Engineer, conveyances, Nominal Payment Waiver of Appraisal, W-9's, closing statements) access to READS, complete diaries for each parcel, capabilities to work through the Jurisdictional process if needed, ability to read TPP's, Exhibits, etc., the ability to order/complete appraisals if parcels switch from nominal to appraisal, knowledgeable and capable of handling the relocation appraisal, furniture/equipment/fixture appraisal, if needed. In addition, to the knowing the relocation process. Anticipated Construction Cost: $30,000,000-$34,999,999 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - RFP Engineering - Madison - Deforest *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$34,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2027
US-51, McFarland, WI
Related To This Project
McFarland, WI
--
McFarland, WI
--
McFarland, WI
--
McFarland, WI
Bid Date: Mar 17 2026
McFarland, WI
--
McFarland, WI
Bid Date: Dec 17 2025
McFarland, WI
Bid Date: Nov 20 2025
McFarland, WI
Bid Date: Nov 20 2025
McFarland, WI
Bid Date: Nov 13 2025
McFarland, WI
--
McFarland, WI
Bid Date: Aug 25 2025
McFarland, WI
Bid Date: Sep 10 2025
McFarland, WI
Bid Date: Apr 24 2025
McFarland, WI
Bid Date: Mar 12 2025
McFarland, WI
Bid Date: Mar 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
