BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2026 at 7:00 PM

Updated February 16, 2026

Site work and paving for a mixed-use development in Hermitage, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project is the construction of approximately 0.21 mile from SR 0018/Segment 0271/Offset 0051 to SR 0018/Segment 0271/Offset 1174 including cement concrete sidewalk, asphalt and concrete pavement adjustments, modular architectural block wall, and handrail, as indicated on the approved drawings included in the bid package. Project Cost Range: $200,000.00 - $499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 25.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: Yes State Type of Work: Transportation Alternative Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PA DOT - Route 18 (N Hermitage Road) Sidewalk Project *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Sidewalks / Parking Lot

$500,000.00

Public - State/Provincial

Paving, Site Work

15

8

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
251
Bidding Soon
2,049
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

June 8, 2026

Project location map

N Hermitage Rd, Hermitage, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.