Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2026 at 8:00 PM
Updated April 1, 2026
Site work for a water / sewer project in Greenfield, Iowa. Completed plans call for site work for a water / sewer project.
The project is for the Greenfield Sanitary Sewer Rehabilitation, Contract 1-2026. The work includes approximately 28,000 linear feet of cured in place pipe lining, covering 6-inch through 15-inch pipe. It also includes three internal point repairs, nine dig repairs, eight new manholes, and replacement of approximately 212 feet of 12-inch sewer. Bidders are required to obtain bidding documents from specific sources and submit a bid security equal to 5% of their maximum bid price. Bidders must comply with federal wage rates, the President's Executive Order No. 11246 (Equal Employment Opportunity), and the wage requirements prescribed by the federal Davis-Bacon and Related Acts. All iron and steel products used on the project must be produced in the United States and comply with American Iron and Steel requirements. Preferences may be given to products and provisions grown in Iowa, and resident bidders may have certain preferences over nonresident bidders depending on the laws of the nonresident bidder's home state. Disadvantaged Business Enterprises, including small, minority, and women-owned businesses, are encouraged to submit bids. The contract award will be made based on the lowest responsive and responsible bidder. The City of Greenfield reserves the right to reject any or all bids and to waive technicalities. For further requirements regarding bid submittal, qualifications, procedures, and contract award, bidders should refer to the instructions included in the bidding documents. Question Deadline 03/03/2026 - All requests for interpretation must be received at least five business days prior to the day set for receiving Bids. Addenda will be issued not later than three business days prior to the time and day set for receiving Bids. Failure of any Bidder to receive any such Addendum or interpretation shall not relieve such Bidder from any obligations under the Bid as submitted. All Addenda so issued shall become part of the Contract Documents.
Award
Water / Sewer
$1,748,672.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2026
May 11, 2026
To be determined, Greenfield, IA
Related To This Project
Greenfield, IA
Bid Date: Feb 17 2026
Greenfield, IA
Bid Date: Feb 17 2026
Greenfield, IA
Bid Date: Dec 16 2025
Greenfield, IA
Bid Date: Sep 16 2025
Greenfield, IA
Bid Date: Jul 15 2025
Greenfield, IA
Bid Date: Jun 17 2025
Greenfield, IA
Bid Date: May 30 2025
Greenfield, IA
Bid Date: May 15 2025
Greenfield, IA
Bid Date: Apr 24 2025
Greenfield, IA
--
Greenfield, IA
Bid Date: Apr 03 2025
Greenfield, IA
--
Greenfield, IA
Bid Date: Feb 18 2025
Greenfield, IA
Bid Date: Jan 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
