Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 2, 2026 at 7:00 PM
Updated March 3, 2026
Site work, new construction and renovation of a water / sewer project in Terre Haute, Indiana. Completed plans call for site work for a water / sewer project; and water / sewer project.
Bowen Engineering Corporation is soliciting quotations from subcontractors, including small, minority, and women-owned businesses (Disadvantaged Business Enterprises - DBEs) for the Indiana American Water, Terre Haute Water Treatment Facility Project. The project includes the construction of a new pre-engineered metal building to house GAC feed pumps, cartridge filters, GAC vessels, offices, restroom, and electrical room. Site work involves proper disposal of contaminated soil and stone pier subgrade enhancements due to soil conditions. Modifications to the existing Filter Building include relocation of an existing pump, installation of a new GAC backwash pump, and electrical work. Yard piping modifications comprise installation of a new raw water main and GAC backwash waste pipe to the existing backwash holding tank. The GAC pressure vessel system will be pre-purchased by the Owner, and the contractor is responsible for coordinating delivery, handling, storage, installation, and placement of GAC media. Coordination and disposal of water associated with GAC media delivery and startup are required. Subcontracting work includes roofing removal/replacement, coatings, electrical, controls, mechanical, and process vessels installation related to construction of a PFAS water treatment system. Materials and supply work includes coatings, concrete, pipe, fittings, and valves. Subcontractors must affirm compliance with all bid documents and Indiana Finance Authority SRF Loan Program funding requirements. Bid forms and DBE certifications must be submitted as specified.
Post-Bid
Water / Sewer
$2,000,000.00
Public - State/Provincial
New Construction, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed