Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 4, 2026 at 7:00 PM
Updated March 5, 2026
Site work and paving for a mixed-use development in Tipton, Iowa. Completed plans call for site work for a road / highway; and sidewalk / parking lot.
The work generally consists of construction of approximately 660 feet of a road section consisting of 25-foot wide 7" thick PCC pavement, with the existing curb and gutter to remain. The project also includes reconstruction of an intersection, including new sidewalk ramps at two intersections. Bid security is required to accompany each bid, in the form of a cashier's check, certified check, bank money order, certified share draft, or bid bond, as specified. The successful bidder must provide a corporate surety bond for the faithful performance of the contract in an amount equal to 100% of the contract amount. The bid must contain no condition except as provided in the specifications. Electronic project documents are available through the specified website, or by deposit to the designated engineering firm, with a refund available if documents are returned in good condition in the specified time frame. Preference will be given to domestic construction materials, products, and Iowa domestic labor, as required by Iowa statutes. Building materials, supplies, and equipment incorporated into the improvement are exempt from applicable Iowa sales taxes. The contractor must coordinate and maintain records for all tax-exempt purchases. Monthly payments of 97% of the value of completed work will be made, with final payment no earlier than 30 days after final acceptance and submission of lien waivers. Liquidated damages are set at $900 per consecutive working day for delays past the completion date, subject to allowable extensions. Performance, payment, and maintenance bonds are required at 100% of the contract price. Award will be made to the lowest responsible and acceptable bidder, with the city reserving all standard rights regarding bids. Only one contract will be awarded. The work must be completed within 60 calendar days of the written Notice to Proceed. The Notice to Proceed is expected to be issued on or about June 1, 2026. The contractor may begin earlier, but the first payment will not be made before July 1, 2026, to align with the city's fiscal year budget.
Bid Results
Roads / Highways
$164,999.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2026
June 1, 2026
East 1st Street from Cedar Street to Mulberry Street, Tipton, IA
Related To This Project
Tipton, IA
Bid Date: Dec 16 2025
Tipton, IA
--
Tipton, IA
--
Tipton, IA
Bid Date: Jun 12 2025
Tipton, IA
Bid Date: Mar 20 2025
Tipton, IA
Bid Date: Feb 18 2025
Tipton, IA
--
Tipton, IA
Bid Date: Oct 15 2024
Tipton, IA
--
Tipton, IA
Bid Date: Jan 22 2025
Tipton, IA
Bid Date: May 29 2024
Tipton, IA
Bid Date: May 21 2024
Tipton, IA
Bid Date: May 02 2024
Tipton, IA
Bid Date: Feb 15 2024
Tipton, IA
Bid Date: Jan 17 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
