Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 5, 2026 at 7:00 PM
Updated April 1, 2026
Renovation of a medical facility in Britt, Iowa. Completed plans call for the renovation of a medical facility.
For Construction Manager at-Risk (CMaR) services for the project. The CMaR will be chosen using a two-step solicitation process and chosen on "best-value." All CMaR submittals who have demonstrated sufficient qualifications based on the following criteria will be offered the opportunity to submit a request for proposal (RFP) to serve as CMaR on the HCHS Boiler and Chiller Replacement Project: Background Information Experience and Qualifications Office/Corporate Structure Project Team Company Differentiation and Management of the Process Insurance Safety Program The engineering and architecture firms have been hired and the project is currently in the Construction Documents (CD) phase. Questions may be submitted by email in writing to (Accord Architecture Company, Scott T. Blum, AIA, President), at the following email address: (scott@accordarch.com). The Boiler and Chiller Replacement Project includes replacement of the existing air-cooled chillers with new chillers, removal of the existing high-pressure steam plant, installation of a new heating water plant and new smaller high-pressure steam boilers, relocation of the domestic water heaters and softener, a new vacuum pump, modifications to the facility piping to get heating water to all equipment, and various other replacements and upgrades to the facility HVAC systems. Routing of systems within the hospital will require a high level of coordination with the hospital and some architectural modifications for pipes, ducts, etc. The project will be phased to maintain and provide cooling and heating during the summer and winter, respectively. The following list summarizes the scope of the project: o Chilled water plant to be completely removed and replaced, to remain within chiller garage. o Hot water and steam boiler plants to be completely removed and replaced, to be relocated to chiller garage. o Fuel oil tank to be re-piped. Existing tank is under examination for further work. System shall be updated to provide back-up fuel for all boiler systems. o Humidification systems shall be replaced or refed, serving various air handling equipment throughout the facility. o Domestic water heater and softener systems shall be removed and replaced, to be relocated to the chiller garage. o Vacuum pump shall be removed and replaced, to be relocated to the chiller garage. o Electrical systems shall be reworked a needed to feed new equipment o Electrical riser diagram of the entire known facility including new work shall be provided for future reference. o This work shall occur over (4) phases, but shall be further coordinated between trades and the hospital maintenance staff to minimize shut-downs and disruptions to hospital operations. o Any MEPT, architectural, or structural systems affected by this work shall be addressed in the necessary phase. Deadline for Questions from CMaR firms April 22, 2025 by 2:00 p.m. Questions may be submitted by email in writing to (Accord Architecture Company, Scott T. Blum, AIA, President), at the following email address: (scott@accordarch.com).
Post-Bid
Medical
$400,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2026
November 30, 2026
532 1st St NW, Britt, IA
Related To This Project
Britt, IA
Bid Date: Mar 27 2026
Britt, IA
Bid Date: Dec 04 2025
Britt, IA
--
Britt, IA
Bid Date: Dec 16 2025
Britt, IA
Bid Date: Nov 25 2025
Britt, IA
--
Britt, IA
Bid Date: Mar 18 2021
Britt, IA
Bid Date: Jan 29 2025
Britt, IA
Bid Date: Jan 29 2025
Britt, IA
--
Britt, IA
--
Britt, IA
--
Britt, IA
--
Britt, IA
Bid Date: Apr 11 2019
Britt, IA
Bid Date: Jan 17 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
