Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 18, 2026 at 8:00 PM
Updated March 19, 2026
Renovation of a mixed-use development in Montreal, Quebec. Completed plans call for the renovation of a educational facility.
Reference number: 20122470 Deadline for receipt of complaints 2026-02-23 There is provision for a tendering process for each tender No Electronic tender submission accepted Yes, via SEAO, with a document Expected duration of the contract without options (in months) 4 Description of work: For ten (10) schools that do not have an intercom system, the CSSDM wishes to add a loudspeaker system capable of broadcasting a "Code Silver" message in the event of an emergency or potentially dangerous situation for the safety of students and staff. Buildings: - Ecole Saint-Anselme (047): 2743 Rue de Rouen, Montreal, QC, H2K 1N2 - Ecole Champlain (073): 2260 Rue Logan, Montreal, QC, H2K 4L4 - Saint-Etienne School (100): 5959 Christophe Colomb Avenue, Montreal, QC, H2S 2G3 - Louis-Hippolyte-Lafontaine School (130): 4245 Berri Street, Montreal, QC, H2J 2P9 - Centre Lartigue Annexe (134): 1751 Rue Saint-Christophe, Montreal, QC, H2L 3W9 - Ecole Saint-Arsene (154): 6972 Christophe Colomb Avenue, Montreal, QC, H2S 2H5 - Ecole Le Plateau (196): 3700 Calixa-Lavallee Avenue, Montreal, QC, H2L 3A8 - Ecole Petite-Patrie (211): 6841 Henri-Julien Avenue, Montreal, QC, H2S 2V3 - Elan School (360): 3450 De Lorimier Ave., Montreal, QC, H2K 3X6 - Gadbois School (419): 8305 Saint-Andre St., Montreal, QC, H2P 1X9 Site visit: During the submission period, there will be one (1) formal site visit organised by the PUBLIC BODY. The visit will take place on Tuesday, 24 February 2025 at 10:00 a.m. Period/Completion deadline: 7 April to 24 August 2026 The CONTRACTOR must commence work within fifteen (15) working days of receiving the letter confirming the award of the contract. The work must be completed within 183 calendar days. This period is calculated from the date of receipt with reservation. It includes public holidays and vacations, in particular construction holidays. Please note that the Montreal School Service Centre is closed for the summer period, from 19 July 2026 to 1 August 2026 inclusive.
Bid Results
Educational
$76,060.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2026
July 19, 2026
Multiple Locations, Montreal, QC
Related To This Project
Montreal, QC
Bid Date: Mar 04 2026
Montreal, QC
Bid Date: Mar 04 2026
Montreal, QC
Bid Date: Mar 30 2026
Montreal, QC
Bid Date: Mar 05 2026
Montreal, QC
Bid Date: Mar 05 2026
Montreal, QC
Bid Date: Apr 08 2026
Montreal, QC
Bid Date: Mar 31 2026
Montreal, QC
Bid Date: Mar 05 2026
Montreal, QC
Bid Date: Mar 03 2026
Montreal, QC
Bid Date: Mar 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
