BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2026 at 7:00 PM

Updated February 14, 2026

Renovation of a power facility in Philadelphia, Pennsylvania. Conceptual plans call for the renovation of a power facility.

Architectural and engineering services shall be provided to develop complete contract drawings, specifications, technical reports, and cost estimates for Project 642-26-117 to replace Substation A9 at the Corporal Michael J. Crescenz VA Medical Center. Work includes all investigative surveys and verification of as-built conditions; development of construction documents for removing the existing substation and associated outgoing feeders, busducts, and cables; and installation and commissioning of a new substation and distribution equipment. The effort includes correcting Facility Condition Assessment deficiencies by replacing electrical panels and associated feeders in kind, providing new distribution panel boards, branch panels, and feeders designed in accordance with the VA Electrical Design Manual and Standards and NFPA 70, 99, and 110. Required analyses include short circuit, load flow, voltage drop, overcurrent coordination, and arc flash hazard analysis. Updated single-line distribution drawings for normal and emergency power shall be produced. Mechanical, plumbing, structural, and life safety design elements necessary to support the electrical work shall be incorporated. Work is to be phased to minimize or eliminate service outages and must include an Infection Control Risk Assessment. Commissioning of the new electrical panels and equipment is required. The A/E shall collaborate with Medical Center staff and attend programming meetings to confirm design requirements and layout, verify existing conditions, and provide contract time and construction cost estimates. **Location:** Corporal Michael J. Crescenz VA Medical Center 3900 Woodland Avenue, Philadelphia, PA 19104 The period of performance is 180 days. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Power Plant

$750,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
993
Active Projects
439
Bidding Soon
5,418
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2027

Project location map

3900 Woodland Ave, Philadelphia, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.