BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2026 at 7:00 PM

Updated March 3, 2026

Site work and paving for a mixed-use development in Wright City, Missouri. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

**As of March 2nd, 2026, the project was awarded to Mid River Asphalt, Inc, with an awarded amount of $376,656.94** The City of Wright City is seeking bids for the paving of the small gravel parking lot located at Diekroeger Park and the overlay of 2nd St., W. 1st St, Hedeman, Northwest Ave., and the adjoining stub streets. Sealed bids must be marked "Second Street Overlay" and be delivered to City Hall, 636 Westwoods Rd. Wright City, MO. 63390. To obtain a copy of the bid packet, email aogborn@wrightcitymo.gov. The new Project is estimated to be 1,414 square yards of parking lot, 7,788 linear feet of roadway split up between 2 nd St., W. 1 st St, Hedeman, Northwest Ave., and the adjoining stub streets. However, interested bidders are required to take their own measurements as the City will no guarantee the accuracy of the estimated area as provided for the sole purpose of conveying project scale. A. Generally, work shall consist of: I. (Small parking lot at Diekroeger Park) Milling a butt joint at the entrances to 2nd St. Installing 6" of asphalt pavement in two lifts to the gravel parking lot. (Sub grade to be prepared by Public Works Department) II. Mill existing at concrete and side roads for proper matching to all adjoining roads located in the project area. Clean entire street with power brooms. Identify and notify the City of any existing and/or potential problems with the roadway or other related road structures and materials. III. Tack coat with SS-1 tack coat at a rate of 0.08 minimum, Install 1" leveling course of new asphaltic concrete materials. Re-tack coat at a rate of 0.05 minimum and pave 2" with BP-2 asphalt pavement. Once work has begun, with removal of the existing roadway surface, the Contractor shall complete the work within thirty (30) calendar days the The City may charge $500.00 per day for each day this project is not completed past the due date unless inclement weather causes the delay or other non-discretionary reasons subject to agreement by the City of Wright City For questions or additional information on this bid, contact Kyle Roettger, Public Works Director, at 636-745-3101 or email - kroettger@wrightcitymo.gov

Award

Sidewalks / Parking Lot

$376,657.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
2
Bidding Soon
1,083
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

June 1, 2026

Project location map

Multiple Locations, Wright City, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.