Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 17, 2026 at 8:00 PM
Updated March 18, 2026
Site work and renovation of a water / sewer project in Scotts Valley, California. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
**As of March 17, 2026, bids were canceled. No definite date for the rebid.** he scope of work to be performed under this contract consists of: o Removing the two (2) existing check valves within the lift station piping assembly. o Supplying and installing two (2) new check valves meeting City specifications (to be confirmed at walk-through). o Ensuring all fittings, gaskets, supports, and connections are properly aligned, sealed, and torqued. o Performing system testing to confirm proper valve function and leak-free operation. o Providing traffic control (if needed), safety measures, and confined space entry compliance. o Disposing of old materials according to applicable regulations. o Restoring the site to its original condition after work completion. The anticipated construction start is expected to occur approximately 3 weeks after contract award and issuance of the Notice to Proceed.
Final Planning
Water / Sewer
$700,000.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2026
September 17, 2026
15 Suzanne Ln, Scotts Valley, CA
Related To This Project
Scotts Valley, CA
Bid Date: Apr 28 2026
Scotts Valley, CA
--
Scotts Valley, CA
--
Scotts Valley, CA
Bid Date: Jul 24 2025
Scotts Valley, CA
Bid Date: May 23 2025
Scotts Valley, CA
--
Scotts Valley, CA
Bid Date: Mar 18 2025
Scotts Valley, CA
Bid Date: Feb 27 2025
Scotts Valley, CA
Bid Date: Mar 03 2025
Scotts Valley, CA
Bid Date: Sep 14 2021
Scotts Valley, CA
Bid Date: Jun 17 2024
Scotts Valley, CA
--
Scotts Valley, CA
--
Scotts Valley, CA
--
Scotts Valley, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
