BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Demolition, site work and addition to a civil project in Dayton, Ohio. Conceptual plans call for the demolition of a water / sewer project; for the addition of a water / sewer project; and for site work for a water / sewer project.

The City of Dayton, Department of Water, is seeking proposals from experienced and professional engineering consultants or teams to design an expansion of the capacity of the South Miami Well Field. The work includes siting and designing four new production wells and a pipe network to connect the new wells to an existing raw water main. The design also requires a new air stripper complex to reduce volatile organic compound (VOC) levels, and modifications to restore the existing Relift Pump Station for water transfer to the Miami Water Treatment Plant. The scope includes civil, mechanical, chemical, and electrical engineering tasks, with project management and ongoing coordination with Dayton Water. Proposals should detail the consultant's qualifications, experience, and project approach, as well as specific tasks required to execute the project. Consultants must prepare a project schedule, maintain a secure project online accessible to City staff, and meet all permitting requirements, including those of the Ohio EPA. Design work must follow all relevant regulations and involve hydrogeologic investigations for well siting. Other project elements include demolition of the existing air stripper system, design of new pumping and chemical feed systems, and installation of a sanitary line for wastewater conveyance. Monthly invoices, progress meetings, and regular communication with Dayton Water are required throughout the project. Proposals must be submitted electronically as PDF files, and consultants should prepare for possible pre-proposal meetings and site visits as outlined by the City of Dayton. Question Deadline 03/03/2026 at 12:00 PM ET Please direct all communications regarding the RFP process to: City of Dayton, Department of Water Liz Zelinski 101 West Third Street Dayton, Ohio 45402 Telephone: (937) 333-6134 Fax: (937) 234-1568 E-Mail: Liz.Zelinski@daytonohio.gov Written Responses to Questions: March 10, 2026 Should bid documents require multiple emails, please designate in the "Subject" line of each email sent: RFP No 26-006WTWS Miami Well Field South Expansion Design, RFP No 26-006WTWS Part 1, RFP No. 26-006WTWS Part 2, and so forth. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

$8,000,000.00

Public - City

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
165
Bidding Soon
2,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

March 19, 2027

Project location map

To be determined, Dayton, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.