BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Madison, Wisconsin. Completed plans call for the renovation of a educational facility.

In general, the work consists of: Replacement of (2) 80 KVA Uninterruptible Power Supplies with (2) Agency supplied100 KVA (upgradeable to 160 KVA) Uninterruptible Power Supplies. Work includes light fixtures, concrete equipment pads, interior curb cuts and extensions, removal of abandoned air handler, duct work changes, and a chain link fence enclosure. Additional Agency supplied equipment to be installed by contractor includes battery racks, DC battery disconnects and manual UPS bypasses. Question Deadline 03/13/2026 Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least ten (10) days before the date set for bid opening.

Bid Results

Educational

$276,374.00

Public - State/Provincial

Renovation

16

18

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

June 1, 2026

Project location map

500 Lincoln Dr, Madison, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.