BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Saint Helena, California. Conceptual plans call for the demolition of a bridge / tunnel.

The County is seeking technical proposals for Preliminary Engineering, Environmental, Right of Way, PS&E Design, and Construction Support Services related to the preparation, execution, and completion of services for the Conn Valley Road Bridge over Conn Creek Replacement Project. The selected consultant will provide these services through the construction phase, including all technical and administrative tasks, documentation, responses to Caltrans, right-of-way certification, and construction authorization. The consultant will assist the County during the bid period and provide design support during construction. The consultant must be fully familiar with the guidelines, procedures, and requirements of the Highway Bridge Program as administered by Caltrans. The County reserves the right to adjust the scope of services as deemed appropriate and necessary. The existing bridge is to be replaced or widened with a new two-lane bridge, and the project is to be managed in cooperation with Caltrans and funded through the Highway Bridge Program with a local County match. Question Deadline 03/05/2026 at 5:00 PM PT Respondents shall submit all inquiries regarding this solicitation via electronically. Question Response Deadline: March 13, 2026, 5:00pm Contract Negotiations and Development Completion :May 21, 2026 Notification of Intent to Award:May 22, 2026 Contract Awarded:June 2, 2026 Commencement of Services:June 8, 2026 The County anticipates the start of construction will be Spring of 2028 3.1. Scope of Work The general scope of services will include, but is not limited to the following: Project Management Topographic Surveying (as needed to complete Final Design) Geotechnical Engineering consultation, borings, geotechnical report, and foundation plans Preliminary engineering plans, profiles, cross sections, estimates, utility maps, etc. Structures Field Review, Type Selection Report, and structure plans and details Bridge and approach road plans NEPA Studies and report Permit applications from USACOE, RWQCB, and CDFW Biological, wetland, and aquatic surveys and Natural Environmental Study per PES form Archeological research, APE map, survey report, AB 52 consultation, extended phase 1 plan, testing, extended phase 1 report, and mitigation measures Bridge architecture and calculations Hydrologic and Hydraulic analyses, LHSR, and drainage design Creek Geomorphology and scour protection Traffic handling, signage, striping, and staging Mitigation planting and irrigation plans, specifications, and estimate 35%, 65%, and 95% Plans, Specifications, & Estimate (PS&E) packages California Environmental Quality Act (CEQA) and the National Environmental Policy Act (NEPA) Document Conformance, including completing an initial study / mitigated negative declaration and obtaining necessary environmental permits from regulatory agencies (PLACs) Right of Way Engineering Services, including plat & legal preparation, deeds, appraisals, offer documents, negotiations, agreement, notices to owners, utility agreements, and certification Final design, including 100% and Final Construction Drawings, Specifications, Special Provisions and Cost Estimates for the Bridge, Roadway approaches, Temporary utility support and pedestrian access bridge Bidding and Construction Support Services Preparation of Reports and Documentation in accordance with State of California Department of Transportation (Caltrans) Local Assistance Procedures Manual (LAPM) and Local Assistance Program Guidelines (LAPG) Other services necessary to complete the Project This is a Federal-Aid Project subject to Caltrans Local Assistance Procedures and other Caltrans requirements. All Deliverables, Reports, and Work Products shall be prepared and completed in accordance with Local, State, and Federal standards, where applicable. Site Visit Not Required. The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$6,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

4

11

10

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
227
Bidding Soon
3,220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2026

Project location map

Conn Valley Rd, Saint Helena, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.