BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 16, 2026 at 7:00 PM

Updated March 5, 2026

Site work for a bridge / tunnel in Bremerton, Washington. Completed plans call for site work for a bridge / tunnel.

The project involves a Fish Barrier Removal Board culvert replacement located in the Chico area adjacent to Dickerson Creek, in Kitsap County, Washington. The scope includes stream dewatering, purchase and installation of a 55 foot long by 14 foot wide steel bridge, temporary access crossing, grading, and cleanup. Work is to be conducted in accordance with Washington State's Prevailing Wage Law. A Bid and Contract Bond are required.

Post-Bid

Bridges / Tunnels

$300,846.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
124
Bidding Soon
1,902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

April 18, 2026

Project location map

To be determined, Bremerton, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.