BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 9, 2026 at 8:00 PM

Updated March 10, 2026

Site work and paving for a sidewalk / parking lot in Idaho Falls, Idaho. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000412976 Question Deadline 02/27/2026 at 11:30 AM MT Questions are submitted online Yes General Requirements - Contractors License Required - FOB Destination - Installation Required - Insurance Required - License Required The City of Idaho Falls is currently soliciting proposals from Contractors holding a current Right-of-Way license for concrete work. The quotation shall consist of furnishing all labor, materials and equipment necessary to satisfactorily install curb and gutter, rebar, sidewalk or related flat work required as described in one or more work orders issued by the City from time to time during 2026. The work generally involves various quantities assigned at times and locations at the sole discretion of the City. Work will be assigned on a job-by-job basis, and the City reserves the right to assign more than one Contractor to do such work. The successful Contractor shall be required to undertake the work at the unit prices stated in the low proposal in order to be assigned a portion of this work. Contractors will have no contractual right to perform any work pursuant to such quotations, until a written repair work order is issued. Multiple job locations may be included in a written repair work order, however each job will retain its separate identity and all program requirements will be applied separately to each job, notwithstanding inclusion on a single repair work order. A payment bond will not be required for any single job unless the estimated cost of such job exceeds $10,000, notwithstanding that the aggregate total of all jobs included in the contract repair work order may exceed such amount. The Street Division will designate all work by issuance of a concrete repair work order. The concrete repair work order will indicate the location, along with the quantity and type of work required. Payment shall be as denoted on the following page. Unless otherwise indicated on the repair work order, all such specified work must be completed within a 2-week period following the date of issue. The City will remove the concrete to be replaced, furnish and place fill material necessary to bring the finished concrete to grade within 0.1 of a foot. Detectable Warning panels, furnished by the City, are required in radius installation. The work shall not be deemed complete until the site has been cleaned of all associated forms and debris, satisfactorily restored and ready for pavement patching. At no time shall debris be allowed to accumulate or become a potential hazard that may cause damage to the public or adjoining properties. All barricades, signs or other traffic control devices, pedestrian or vehicular, required for the satisfactory completion of this work shall be the responsibility of the Contractor. Exception: City will provide traffic control for work on arterial streets. These must remain in place until the City has accepted that work. Failure to timely perform any work order, once assigned, or to otherwise comply with all of the foregoing stipulations may be cause for the City to cease issuing repair work orders to a Contractor. All payments due may be withheld until the work in progress has been acceptably completed. If the Contractor is unwilling or incapable of completing said work, the City reserves the right to cancel the work order and cause the incomplete work to be finished by another Contractor. No payment will be made for incomplete work under any repair work order. Any work for which repair work orders have been issued but for which work has not begun may be canceled at any time and the Contractor shall return said repair work orders to the Street Division. Note * The Envelope containing your bid must be sealed, show the Invitation to Bid Number, the date and time of opening and your Company name. The envelope should be addressed as follows: Vendor's Name Invitation to Bid Number: IF-26-004 Date: March 6, 2026 Time: 11:00 AM

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
21
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

April 6, 2026

Project location map

308 Constitution Way, Idaho Falls, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.