Published February 16, 2026 at 7:00 PM

Updated February 17, 2026

New construction of an industrial development in Naperville, Illinois. Completed plans call for the construction of a industrial development.

City of Naperville is modifying their existing Tollway Substation to include the installation of a new masonry building that will house new 34.5kV indoor switchgear and associated control equipment. This bid is being issued to procure the supply and construction of the new 34.5kV switchgear control building. This building has been designed by others and the specification and drawings will be attached to this bid. The Utility is looking to move its 34.5kV switchgear indoor into a new switchgear building which will be constructed as part of this bid.

GC Bidding

Industrial

$1,000,000.00

Public - City

New Construction

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
803
Active Projects
532
Bidding Soon
3,693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2026

April 30, 2026

Project location map

1392 Aurora Ave, Naperville, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.