Site work for a power facility in Yorkana, Pennsylvania. Completed plans call for site work for a power facility.
Bids for the procurement and installation of two (2) Truck Scales for the Blackbridge Road Transfer Station Construction Project Bid security in the form of a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10%. Question Deadline 03/02/2026 at 10:00 AM ET All questions about the meaning or intent of the Bidding Documents are to be submitted via electronically. Telephone inquiries are unacceptable. No questions will be answered after the Request for Information (RFI) deadline provided on electronically A meeting link will be provided to those requesting virtual participation. YCSWA will transmit to all Plan Holders of record such Addenda as it considers necessary in response to questions arising at the Conference. All bids shall be irrevocable for sixty (60) days after the bid opening date unless award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case this Bid shall remain subject to acceptance for 120 days after the bid opening date as provided by the Public Works Contract Regulation Law Act of November 26, 1978 (P.L. 1309, No. 317), as amended by the Act of December 12, 1994 (P.L. 1042, No. 142). YCSWA reserves the right to reject any and all Bids and to waive any omissions, errors, mistakes, defects, or irregularities in any Bid at its sole discretion. Contractor shall complete all Work as specified or indicated in the applicable Contract Documents listed below: o All Truck Scale work required for the Blackbridge Road Transfer Station Construction Project, as indicated on the Contract Drawings, Technical Specifications, and other Contract Documents. o Coordination of all Truck Scale-related work with the Owner, Engineer, and other Contractors to ensure proper integration with the overall Project. o Mobilization and Demobilization, including mobilizing and demobilizing all materials, labor, tools, equipment, and personnel to and from the Project site. o Temporary services as required to maintain ongoing operations of existing facilities, including the scalehouse, waste-to-energy facility, and other operational areas affected by the Work. o Equipment Supply and Installation, including: o Two (2) truck scales, complete, including platform/weighbridge, load cells, indicator/instrumentation, and all miscellaneous components required for a complete, operable installation. o Exterior digital display with red light/green light at each end, including mounting and associated components. o All miscellaneous components, appurtenances, and fasteners necessary to provide a complete, fully operational installation. o Controls, Electrical, and Instrumentation, including: o Line-voltage and low-voltage wiring; load cell/junction box/indicator interconnections; and all cabling installed in stainless steel conduit with required fittings at load cells. o Grounding and surge/lightning/transient protection system, including the specified single-point grounding and protection components. o Interface with PC scales software and associated configuration required for intended operation. o Electrical connections to the Owner-provided power source as shown in the Contract Documents. o Submittals and Engineering, including sealed foundation/installation drawings by a Pennsylvania-licensed Engineer, shop drawings, product data, and electrical wiring/grounding/surge protection diagrams as required by the Specifications. o Testing, Startup, and Certification, including manufacturer field services; field testing and acceptance; calibration to Handbook 44 and applicable Pennsylvania Department of Agriculture (Division of Weights and Measures) requirements; and provision of required scale certification for capacity and accuracy. o Training and Documentation, including two (2) days of operator training and the provision of complete operation and maintenance manuals. o Warranty, providing the manufacturer's standard warranty in accordance with the Contract Documents.
Post-Bid
Power Plant
$300,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2026
April 9, 2026
2653 Black Bridge Rd, Yorkana, PA
Related To This Project
Yorkana, PA
Bid Date: Mar 05 2026
Yorkana, PA
Bid Date: Jan 09 2026
Yorkana, PA
Bid Date: Oct 27 2025
Yorkana, PA
Bid Date: Sep 19 2025
Yorkana, PA
--
Yorkana, PA
Bid Date: Jul 09 2025
Yorkana, PA
Bid Date: Jun 20 2025
Yorkana, PA
Bid Date: Apr 03 2025
Yorkana, PA
--
Yorkana, PA
Bid Date: Jul 14 2021
Yorkana, PA
Bid Date: Apr 08 2024
Yorkana, PA
--
Yorkana, PA
Bid Date: Jan 13 2022
Yorkana, PA
Bid Date: Jul 06 2023
Yorkana, PA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.