BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 19, 2026 at 7:00 PM

Updated February 20, 2026

Site work and paving for a mixed-use development in Arlington Heights, Illinois. Completed plans call for site work for a road / highway; for paving for a sidewalk / parking lot; and water / sewer project.

Part A requires replacement of approximately 10,800 linear feet of 8" water main using open cut methods, including new water services, lead service line replacements, hydrants, valves, and other appurtenances. Part B involves complete surface restoration of approximately 11,000 linear feet of roadway, including asphalt milling and resurfacing, structure adjustments, and the removal and replacement of select sidewalks, driveways, and curb and gutter. All proposals must be accompanied by a bid security in the amount of 10% of the total bid in the form of a certified check, bid bond, or cashier’s check payable to the Village. Bidders must comply with the Prevailing Wage Rate Act and applicable equal employment opportunity provisions. Bids must be submitted electronically, and vendors are required to register and be logged in before viewing bid documents. Detailed instructions for registration, linking vendor numbers, and bid submission are provided via the Electronic Bid Management System.

GC Bidding

Water / Sewer

$8,000,000.00

Public - City

Paving, Site Work

37

13

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
870
Active Projects
579
Bidding Soon
4,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

May 18, 2026

Project location map

To be determined, Arlington Heights, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.