BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 17, 2026 at 7:00 PM

Updated February 18, 2026

Site work for a water / sewer project in Berwick, Pennsylvania. Completed plans call for site work for a water / sewer project.

Perform the following work: approximately 530 tons of 2A Subbase, approximately 840 linear feet of reshaping ditches, approximately 345 tons of R-3 Rock, 4 inlet boxes, approximately 300 linear feet of 18" pipe, approximately 815 linear feet of underdrain, approximately 400 square feet of French Mattress, approximately 80 tons of R-7 Rock, approximately 50 pounds of seed and mulch, 8 headwalls, and approximately 21 tons of pavement repair. All work and material must meet current Pennsylvania Department of Transportation Specifications Form 408 and its Supplements. Bid Bond in the amount of 10% of the contract is required of all bidders for each contract. Performance bond and payment bond in the amount of 100% of the contract, as well as proof of workers compensation insurance will be required within 20 days of receiving notice of being awarded the bid. Proposals must be upon the forms furnished by the Municipality. The Municipality reserves the right to reject any or all proposals. Prevailing wages are applicable to this project. A mandatory on-site pre-bid meeting will begin at Yost Hollow Road/ Croop Road intersection location.

Sub-Bidding

Water / Sewer

$200,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
492
Active Projects
249
Bidding Soon
1,827
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

April 16, 2026

Project location map

To be determined, Berwick, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.