BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 24, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a golf course in Auburn Hills, Michigan. Completed plans call for site work for a golf course.

Reference Number 0000413149 Bid Intent Not Available The City of Auburn Hills is seeking responses from qualified vendors to upgrade the existing irrigation control system at Fieldstone Golf Club by replacing all current satellite controllers with advanced Lynx Smart Satellite Controllers. The following document outlines the nature and scope of work requested and provides a summary of the City of Auburn Hills and Fieldstone Golf Club. SCOPE OF WORK & SPECIFICATIONS Objectives o Modernize the irrigation control infrastructure with Lynx Smart Satellite technology. o Ensure reliable connectivity and optimal performance across all stations. Improve durability and aesthetics by replacing unsatisfactory concrete pads. Scope of Work 1. Removal of Existing Equipment o Safely remove all existing satellite controllers from the site. 2. Installation of New Controllers o Install 24 Lynx Smart Satellite Controllers, configured for station capacities ranging from 16-station 2-way wire to 64-station 2-way wire. 3. Wiring and Integration o Connect all irrigation stations to the new controllers using appropriate wiring standards. o Verify system functionality and connectivity. 4. Concrete Pad Replacement o Inspect existing concrete pads supporting controllers. o Replace any pads that do not meet structural or aesthetic standards. Deliverables o Fully installed and operational Lynx Smart Satellite Controllers. o Updated wiring and integration for all stations. o Replacement of substandard concrete pads. o Final inspection and system performance verification. Assumptions & Exclusions o All Materials will be purchased by the City of Auburn Hills. o All work will be completed with the oversight of the Golf Course Superintendent. o All work will comply with manufacturer specifications and local regulations. o Excludes any unrelated landscaping or irrigation redesign beyond controller replacement. Question Deadline 03/09/2026 at 5:00 PM ET Questions are submitted online No, Please direct your questions by email to Myles Sprague, Golf Course SuperintendentMyles.Sprague@davey.com Any questions received after this date will not be considered. All questions will be answered by March 10, 2026. Please direct questions to Myles Sprague, Golf Course Superintendent - Myles.Sprague@davey.com

Award

Golf Course

$36,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
441
Active Projects
243
Bidding Soon
3,083
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2026

April 16, 2026

Project location map

1984 Taylor Rd, Auburn Hills, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.