BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Lockport, Illinois. Completed plans call for site work for a water / sewer project; and water / sewer project.

The project involves expanding the Division Street WWTP’s capacity to 6.2 MFD DAF, 17.1 MGD DMF, and a peak flow with excess flow (total capacity) of approximately 28.56 MGD. The work includes abandonment of the old North Treatment Train, installation of an enhanced aeration process with new blowers and controls, expansion of the chemical phosphorus removal system, modifications to the raw sewage pump station with new submersible pumps, removal and replacement of mechanical screening equipment, construction of a new secondary clarifier, expansion of the RAS/WAS Pump Station with a new control building, installation of a new aerobic digester diffusion system and blowers, modification of the North Plant Solids Handling Building for thickening and dewatering redundancy, construction of a new excess flow disinfection structure, repurposing of an existing final clarifier for excess flow, replacement of digester blowers in the existing building, provision of additional dewatered biosolids storage, and construction of a new administration building and main electrical service/feed, a new maintenance garage, as well as other miscellaneous items of work. Bidders are instructed to submit payment for plans and documents, and to attend a mandatory pre-bid meeting.

Bid Results

Water / Sewer

$71,460,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
546
Active Projects
363
Bidding Soon
4,473
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2026

June 15, 2026

Project location map

425 Division St, Lockport, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.