Demolition, site work and paving for a water / sewer project in Pilot Point, Texas. Completed plans call for site work for a water / sewer project.
*As of April 14, 2026, the CMAR has already announced their proposed awarded contractor for this work package, and they are expecting to officially award this contractor either at the end of this week or early next week. Project construction is estimated to start in Q3 2026. This Work Package includes furnishing and constructing all headworks-related structures, piping, paving, and associated civil work in accordance with the Contract Documents. Question Deadline 03/06/2026 at 5:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via Online. Key Scope Elements: - Furnish all labor, equipment, materials, transportation, supervision, incidentals, and insurance required to construct the following major facilities: Flow Equalization Basin (FEB), FEB Return Lift Station, Influent Splitter Box, Headworks Screening Facilities, Grit Chambers, Influent Lift Station, Flow Meter Structure. - Demolish and dispose of six (6) existing sludge drying beds per Construction Drawings (Volume 6). Any remaining sludge within beds to be demolished shall be disposed of at a TCEQ-approved landfill or land application site negotiated by the Contractor. - Furnish and install concrete paving around the headworks structures and gravel surfacing in adjacent areas, in accordance with the Contract Documents. - Excavate, install, connect, test, and backfill all piping and manholes, including connections to existing systems. Provide all trench safety plans, protective systems, labor, and equipment as required by regulations and Contract Documents. Piping systems include: Non-Potable Water (NPW), Storm Water (SW), Primary Effluent (PE), Raw Sewage (RS), including associated manholes, Potable Water (PW), Drain Lines (DR), Grit Removal (GR). - Restore all disturbed areas to match surrounding grades per Contract Documents. - Utilize the Borrow Area for backfill or disposal of clean spoils, as permitted. - Provide all labor, materials, equipment, services, commissioning, functional testing, and operator training for all applicable systems, equipment, and structures. - Failure to meet required milestones or final completion date will result in liquidated damages of $2,500 per day. - Exclusions: Permanent dumpsters at Headworks and Sludge Handling Facility (provided by the City of Pilot Point); Removal of sludge from existing sludge drying beds (by City of Pilot Point). - No alternates specified.
Bid Results
Water / Sewer
$4,000,000.00
Public - City
Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.