Published April 14, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work and paving for a water / sewer project in Pilot Point, Texas. Completed plans call for site work for a water / sewer project.

*As of April 14, 2026, the CMAR has already announced their proposed awarded contractor for this work package, and they are expecting to officially award this contractor either at the end of this week or early next week. Project construction is estimated to start in Q3 2026. This Work Package includes furnishing and constructing all headworks-related structures, piping, paving, and associated civil work in accordance with the Contract Documents. Question Deadline 03/06/2026 at 5:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via Online. Key Scope Elements: - Furnish all labor, equipment, materials, transportation, supervision, incidentals, and insurance required to construct the following major facilities: Flow Equalization Basin (FEB), FEB Return Lift Station, Influent Splitter Box, Headworks Screening Facilities, Grit Chambers, Influent Lift Station, Flow Meter Structure. - Demolish and dispose of six (6) existing sludge drying beds per Construction Drawings (Volume 6). Any remaining sludge within beds to be demolished shall be disposed of at a TCEQ-approved landfill or land application site negotiated by the Contractor. - Furnish and install concrete paving around the headworks structures and gravel surfacing in adjacent areas, in accordance with the Contract Documents. - Excavate, install, connect, test, and backfill all piping and manholes, including connections to existing systems. Provide all trench safety plans, protective systems, labor, and equipment as required by regulations and Contract Documents. Piping systems include: Non-Potable Water (NPW), Storm Water (SW), Primary Effluent (PE), Raw Sewage (RS), including associated manholes, Potable Water (PW), Drain Lines (DR), Grit Removal (GR). - Restore all disturbed areas to match surrounding grades per Contract Documents. - Utilize the Borrow Area for backfill or disposal of clean spoils, as permitted. - Provide all labor, materials, equipment, services, commissioning, functional testing, and operator training for all applicable systems, equipment, and structures. - Failure to meet required milestones or final completion date will result in liquidated damages of $2,500 per day. - Exclusions: Permanent dumpsters at Headworks and Sludge Handling Facility (provided by the City of Pilot Point); Removal of sludge from existing sludge drying beds (by City of Pilot Point). - No alternates specified.

Bid Results

Water / Sewer

$4,000,000.00

Public - City

Demolition, Paving, Site Work

231

45

13

4

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

July 6, 2026

Project location map

1400 N St James Rd, Pilot Point, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.