BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 20, 2026

Site work and new construction of a municipal facility in Pilot Point, Texas. Completed plans call for the construction of a municipal facility.

*As of April 14, 2026, the CMAR has already announced their proposed awarded contractor for this work package, and they are expecting to officially award this contractor either at the end of this week or early next week. Project construction is estimated to start in Q3 2026. This Work Package includes furnishing and constructing the Administration Building, including associated piping, site restoration, permitting, and startup services, in full accordance with the Contract Documents. Key Scope Elements: - Administration Building: Furnish all labor, equipment, materials, transportation, supervision, incidentals, and insurance necessary for construction of the Administration Building. - Piping: Excavate, install, connect, test, and backfill all piping and manholes, including connections to existing systems. Provide all required trench safety plans, protective systems, equipment, and labor in accordance with applicable regulations and the Contract Documents. Piping systems include: Non-Potable Water (NPW): Lines 19A, 19B; Potable Water (PW): Line 20; Drain Line (DR): Line 17E. - Site Restoration: Restore all disturbed areas to match surrounding grades in accordance with the Contract Documents. - Permits & Inspections: Coordinate and obtain all required permits, certificates, and inspections in accordance with the Contract Documents and City of Pilot Point requirements. - Borrow Area: Utilize the Borrow Area for backfill or disposal of clean spoils, as permitted. - Startup & Testing: Provide complete startup, functional testing, commissioning, and operator training for all applicable systems, equipment, and structures in accordance with the project specifications. Question Deadline 03/06/2026 at 5:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via online.

Bid Results

Municipal

$79,281,915.00

Public - City

New Construction, Site Work

234

52

38

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
434
Active Projects
198
Bidding Soon
4,385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

July 6, 2026

Project location map

N St James Rd, Pilot Point, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.