Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 14, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a water / sewer project in Pilot Point, Texas. Completed plans call for site work for a water / sewer project; and water / sewer project.
*As of April 14, 2026, the CMAR has already announced their proposed awarded contractor for this work package, and they are expecting to officially award this contractor either at the end of this week or early next week. Project construction is estimated to start in Q3 2026. Wall Engineering Project # PP-17-05 Wastewater Treatment Plant Improvements - Work Package 01 - Initial Site Grading This Work Package includes initial site grading to support subsequent construction activities. Work consists of, but is not limited to, clearing and grubbing, demolition, grading, and site preparation in accordance with the Contract Documents. Key elements include achieving rough site grading to 0.10 feet of final grade, providing all labor, materials, equipment, insurance, supervision, safety planning, and quality control, demolition and disposal of two concrete structures, heavy clearing and grubbing, final site grading to 0.10 feet of final subgrade (except at Aeromod structure limits), required surveying and layout, stockpiling topsoil, utilizing designated borrow area, restoring disturbed areas, grading contractor trailer and parking areas with 6 inches of flex base, and installing a construction road with an additional 6 inches of flex base including storm drains and headwalls. Base Bid work must be completed on or before June 31, 2026. Liquidated damages of $2,500 per day apply for failure to meet required milestones or completion dates. There is an alternate for debris disposal, with pricing per load for removal and disposal of stockpiled soils as directed. Question Deadline 03/06/2026 at 5:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via CivCast
Bid Results
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2026
July 6, 2026
To be determined, Pilot Point, TX
Related To This Project
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: May 07 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
