Published April 14, 2026 at 8:00 PM
Updated May 21, 2026
Site work and new construction of a water / sewer project in Pilot Point, Texas. Completed plans call for site work for a water / sewer project.
*As of April 14, 2026, the CMAR has already announced their proposed awarded contractor for this work package, and they are expecting to officially award this contractor either at the end of this week or early next week. Project construction is estimated to start in Q3 2026. Potential MBE Participation 24.50% Potential WBE Participation 11.34% Question Deadline 03/06/2026 at 5:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via Online. This Work Package includes furnishing and constructing the Aeromod (Activated Sludge Process) Basin, Blower Building, associated piping, process equipment, and startup services in accordance with the Contract Documents. Key Scope Elements: - Furnish all labor, equipment, materials, transportation, supervision, incidentals, and insurance required for construction of the Aeromod Basin and Blower Building. - Piping: Excavate, install, connect, test, and backfill all piping and manholes, including connections to existing systems. Provide all trench safety plans, protective systems, equipment, and labor in accordance with applicable regulations and Contract Documents. Piping systems include: Primary Effluent (PE): Line 4; Drain Line (DR): Line 17A; Compressed Air (CA): Lines 15A, 15B, 15C, 15D, 15E, 15F, 29A; Secondary Effluent (SE): Lines 5A, 5B; Sludge (SL): Line 16. - Construction Road Maintenance: Maintain the construction access road in a safe and passable condition throughout the construction phase, including grading, dust control, drainage management, and ongoing maintenance as directed by the CMAR. - Process Seeding: Establish the biological treatment environment by seeding the aeration basin with activated sludge obtained from the adjacent wastewater treatment plant in a manner sufficient to initiate and sustain biological activity for proper process startup. - Blowers: Furnish and install three (3) blowers complete with Variable Frequency Drives (VFDs) and harmonic filters. - Permits & Inspections: Coordinate and obtain all required permits, certificates, and inspections in accordance with the Contract Documents and City of Pilot Point requirements. - Site Restoration: Restore all disturbed areas to match surrounding grades per Contract Documents. - Borrow Area: Utilize the Borrow Area for backfill or disposal of clean spoils, as permitted. - Startup & Testing: Provide all labor, materials, equipment, services, commissioning, functional testing, and operator training for all applicable systems, equipment, and structures. Failure to meet required milestones or final completion date will result in liquidated damages of $2,500 per day. Exclusions: None specified. Alternates: None specified.
Bid Results
Water / Sewer
$5,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2026
July 6, 2026
Multiple Locations, Pilot Point, TX
Related To This Project
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: May 07 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: Feb 10 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.