BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Pilot Point, Texas. Completed plans call for site work for a water / sewer project.

*As of April 14, 2026, the CMAR has already announced their proposed awarded contractor for this work package, and they are expecting to officially award this contractor either at the end of this week or early next week. Project construction is estimated to start in Q3 2026. This Work Package includes furnishing and constructing treatment-related structures, process piping, equipment supports, and startup services in accordance with the Contract Documents. Furnish all labor, equipment, materials, transportation, supervision, incidentals, and insurance necessary for construction of the following major treatment facilities: Effluent Filters, UV Disinfection Structure, Non-Potable Water Holding and Pumping, Effluent Parshall Flume, Cascade Aeration, Discharge Structure, Sludge Handling, Sludge Loading, and Polymer Feed Systems. Excavate, install, connect, test, and backfill all piping and manholes, including connections to existing systems, and provide trench safety plans, protective systems, equipment, and labor as required. Form, reinforce, and pour all equipment pads per Contract Documents. Furnish and install all remaining piping, equipment, and materials after slab and wall completion by Work Package #07. Restore all disturbed areas to match surrounding grades. Utilize the Borrow Area for backfill or disposal of clean spoils as allowed. Provide complete startup, functional testing, commissioning, and operator training for all applicable systems, equipment, and structures as specified. Coordinate required inspections and activities per Contract Documents and City of Pilot Point requirements. Schedule and milestone requirements and liquidated damages apply for non-compliance. Question Deadline 03/06/2026 at 5:00 PM CT: All questions about the meaning or intent of the Contract Documents shall be received in writing via online portal

Bid Results

Water / Sewer

$8,000,000.00

Public - City

Site Work

232

50

30

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
434
Active Projects
198
Bidding Soon
4,385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

July 6, 2026

Project location map

To be determined, Pilot Point, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.