BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2026 at 7:00 PM

Updated March 4, 2026

Renovation of a military facility in Cordova, Alaska. Completed plans call for the renovation of a military facility.

Remove and replace the existing grease interceptor at USCG Base Kodiak in accordance with the Statement of Work. Work includes all labor, materials, equipment, and services necessary to complete the removal and replacement effort, performed in compliance with applicable Construction Wage Rate Requirements. Performance must be completed within ninety days after issuance of the Notice to Proceed, unless otherwise negotiated. Certified payrolls are required as part of contract performance. A firm-fixed price is required for the complete effort. All contractual and technical questions must be in writing. Provide all necessary expertise, materials, labor, and equipment to complete the excavation and removal of the existing failed grease interceptor and install a new polyethylene grease interceptor. The contractor will rehabilitate approximately 135 LF of existing cast iron pipe using Cured-In-Place-Pipe (CIPP) technology. This includes the reinstatement of 15 connecting branch lines. All work shall be performed at the USCG Air Station Cordova barracks in accordance with all manufacturers' specifications and general industry standards Questions must be received by February 23, 2026, 1:00 p.m. Alaska time, to Robbin Kessler at robbin.m.kessler@uscg.mil Telephone questions will not be accepted. Location: USCG Base Kodiak, 8 Kodiak Coast Guard Base Road, Kodiak, AK 99619

Post-Bid

Military

$200,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2026

April 2, 2026

Project location map

13 Copper River Hwy, Cordova, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.