Renovation of a power facility in Omaha, Nebraska. Completed plans call for the renovation of a power facility.

**As of April 8, 2026, the project was awarded to Omaha Mechanical LLC, with an awarded amount of $242,069.50** Furnishing of all supplies, materials, equipment, labor, and superintendence for LNG Tank Staircase Safety Improvements, GP2946, 100020000022. All bids must be submitted electronically. Bidders must comply with the Nebraska Foreign Adversary Prohibition Act, certifying they are not a scrutinized company and that their products or services do not originate with a scrutinized company. A mandatory Pre-Bid Meeting will be held, and failure to attend may constitute grounds for rejection of the bid. Bid documents can be downloaded free of charge from the Procurement Portal. Project Location: 5801 N 120th St, Omaha, NE 68164. Clarification Deadline 3/4/2026 12:00 PM For questions concerning the Bid Documents, contact Sherri Lightfoot, Director, Procurement at (402) 504- 7253. For questions concerning engineering details, contact Sean Alumbaugh, Program Management Department, at 402-506-2683 or by email at Sean_Alumbaugh@mudnebr.com. A. Modifications to existing stairs (Each) - Installation of stainless steel flat bar toe kicks on each stair. Includes surface preparation and welding. Items 2 & 3 on Exhibit A Bill of Materials. B. Additions to existing handrail (Lump Sum) - Installation of stainless steel pipe and flat bar to increase height of safety railing and add cross-rails. Includes surface preparation and welding. Items 1, 4, 5, & 6 on Exhibit A Bill of Materials. C. Reinforcements to handrails (Each) - Installation of stainless steel angle stock to reinforce handrail supports. Includes surface preparation and welding. Item 7 on Exhibit A Bill of Materials. D. Painting (Lump Sum) - All labor, equipment, and materials required for the application of primer to welds and any areas where the existing coating is removed. Includes surface preparation. See Exhibit B for coating specifications. E. Mobilization (Lump Sum) - All labor, equipment, and materials to mobilize and demobilize to and from the job site. Also includes all insurance, bonding, and permit costs associated with the Work.

Award

Power Plant

$242,069.00

Public - City

Renovation

3

9

2

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
74
Bidding Soon
1,009
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

April 10, 2026

Project location map

5801 N 120th St, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.