Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 19, 2026 at 8:00 PM
Updated March 27, 2026
Site work and paving for a road / highway in Old Lyme, Connecticut. Completed plans call for site work for a road / highway.
Old Lyme Public Works Department is requesting proposals from contractors to provide asphalt paving and shimming services for the Town of Old Lyme. Said services will include the removal of the current surface, proper prep, and the installation of a new asphalt surface on various streets throughout Old Lyme. The work is scheduled to be performed from Monday, July 6, 2026 - Thursday, October 1, 2026. The paving projects must be completed by the November 21, 2026, deadline. Pre-proposal meeting: Contact Edward Adanti, cell (860) 662-4003 Questions regarding the scope of services can be directed to the Public Works Supervisor, Edward Adanti at (860) 434-1605 ext.243 or cell (860) 662-4003 prior to the deadline on Friday, March 6, 2026 at 3:00PM. SCOPE OF SERVICES A. The following streets in Old Lyme: 1. Hatchetts Hill Road - Whitman by stop sign near new pavement to Flat Rock Hill (approx. 1,827 square feet), 2. Briar Hill Drive (approx. 1,308 square feet), 3. Browns Lane - to new pavement on Flat Rock Hill (approx. 7,653 square feet), 4. Hawthorne Road (approx. .20 miles), 5. Whitman Lane (approx. .20 miles). B. Each street must comply with the following criteria and must be bid as a complete package. (i.e. no single street bid will be accepted) 1. Mill current road to a depth of 1.5 inches, remove milled material entirely from town property. 2. Base material graded and compacted in preparation for new roadway. 3. One base course of asphalt installed to a minimum compacted thickness of 1 inch. 4. Shimming / Leveling Course: One top course of asphalt installed to a minimum compacted thickness of 1.5 inches. 5. Gravel driveways will be handled by the Town of Old Lyme after paving 6. All drainage and infrastructure repairs will be handled by the Town of Old Lyme prior to paving 7. Tonnage receipts shall be turned in to the Department of Public Works within 48 hours of completion of the project. 8. Please include all costs associated with machinery/equipment movement 9. Please include all traffic control costs 10. The contractor is responsible for all working signage throughout the duration of the project 11. At the end of each day, the road must be left passable for vehicles 12. The contractor shall be responsible for all "Call before you dig" protocols Locations- Hatchetts Hill Road - From Whitman Lane by stop sign near new pavement to Flat Rock Hill Briar Hill Drive (approx. 1,308 feet) Browns Lane - to new pavement on Flat Rock Hill (approx. 7,653 feet) Hawthorne Road (approx. .20 miles) Whitman Lane (approx. .20 miles) 1 Hatchets Hill Road (approx. 1, 827 linear feet): Milling (Depth of 2.5 inches): Leveling Course (+ or - one inch): Install top course / Wearing Surface - Class 2 (inch and half) 2 Briar Hill Drive (approx. 1,308 linear feet): Milling (Depth of 2.5 inches): Leveling Course (+ or - one inch): Install top course / Wearing Surface - Class 2 (inch and half) 3 Browns Lane - to new pavement on Flat Rock Haill (approx. 7, 653 linear feet): Milling (Depth of 2.5 inches): Leveling Course (+ or - one inch): Install top course / Wearing Surface - Class 2 (inch and half) 3 Browns Lane - to new pavement on Flat Rock Haill (approx. 7, 653 linear feet): Milling (Depth of 2.5 inches): Leveling Course (+ or - one inch): Install top course / Wearing Surface - Class 2 (inch and half) 5 Whitman Lane (approx. .20 miles): Milling (Depth of 2.5 inches): Leveling Course (+ or - one inch): Install top course / Wearing Surface - Class 2 (inch and half)
Post-Bid
Roads / Highways
$1,000,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2026
July 6, 2026
Multiple Locations, Old Lyme, CT
Related To This Project
Old Lyme, CT
Bid Date: Mar 11 2026
Old Lyme, CT
Bid Date: Feb 16 2026
Old Lyme, CT
Bid Date: May 01 2026
Old Lyme, CT
Bid Date: May 01 2026
Old Lyme, CT
Bid Date: Jun 10 2026
Old Lyme, CT
--
Old Lyme, CT
Bid Date: Dec 16 2025
Old Lyme, CT
Bid Date: Dec 08 2025
Old Lyme, CT
Bid Date: Dec 19 2025
Old Lyme, CT
Bid Date: Oct 08 2025
Old Lyme, CT
Bid Date: Sep 30 2025
Old Lyme, CT
Bid Date: Aug 12 2025
Old Lyme, CT
Bid Date: Apr 09 2021
Old Lyme, CT
--
Old Lyme, CT
Bid Date: May 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
