BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Lima, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bids are being received for the replacement of the Columbus Grove-Bluffton Road Bridge No. ALL-C.R. 176-4.92 over the Little Riley Creek in Richland Township, Allen County, Ohio. The project length is approximately 350 feet. The SBE percentage for this project is 10%. All bidders are required to submit to ODOT their SBE Utilization Plan prior to or at the time of bid. Any bids received without electronic submission of the SBE Utilization Plan to ODOT at or before bid time, will be deemed unresponsive. The apparent low bidder must supply a SBE Affirmation Form to ODOT within five calendar days of the bid opening. Only contractors who perform at least 50% of the cost of the project and are prequalified for that work with the State of Ohio, Department of Transportation, may submit bids. Subcontractors must also be prequalified unless they perform 15% or less of the total bid. No contract shall be entered into unless the bidder possesses a valid Certificate of Compliance with Affirmative Action Programs. Each bidder is required to furnish with its proposal a Bid Guarantee and Contract Bond. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity and a complete listing of all subcontractors to be used. All work must be completed by the Contract Completion Date October 31, 2026. No work on this project may take place until the existing gas line relocation is complete. Bidders must comply with the prevailing wage rates as issued by the Davis-Bacon Act. The Board of County Commissioners, Allen County, Ohio reserves the right to reject any or all bids submitted or to waive any irregularities. Replacement of the existing structureall-cr176- 04.920 (sfn 0247537) carrying cr176 traffic over little riley creek. work includes minor roadway approach pavement, sidewalk installation, and mgs guardrail. 10% SBE Goal No oral interpretation shall be made to any bidder as to the meaning of any of the contract documents, or be effective to modify any of the contract documents. Every request for an interpretation shall be made in writing and addressed to Brion E. Rhodes, Allen County Engineer; 1501 N. Sugar St., Lima, Ohio 45801-3136 or emailed to brhodes@allencountyohio.com.

Under Construction

Bridges / Tunnels

$989,364.00

Public - County

Demolition, New Construction, Paving, Site Work

3

5

4

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
257
Active Projects
152
Bidding Soon
2,856
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

April 10, 2026

Project location map

W Breese Rd, Lima, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.