Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 9, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a road / highway in Doniphan, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.
4317-RIPL-02-MITGI-55 This project consists of 2 inch asphalt overlay, 1 2 inch wedging course, tack coat, traffic control, striping, and milling. MBE (10%), WBE (10%) Question Deadline 03/13/2026 Every request for such interpretation should be in writing addressed to Mark Webb with Smith & Co. Engineers at 901 Vine Street, Poplar Bluff, MO 63901 and to be given consideration must be received at least five days prior to the date fixed for the opening of bids. A. Item No. 1 - Mobilization and Demobilization (Section 618): 1. This item shall consist of all preparatory work and operation necessary to start work on this project, including all shoulder work and street cleaning, except as provided in separate pay items and shall be made payable to the contractor according to the latest revision of the Missouri Standard Specifications for Highway Construction. 2. Method of Payment: Lump Sum. B. Item No. 2 - 2" Asphalt Overlay (Section 401): 1. This item shall consist of all labor, equipment, and materials associated with the installation of 2" asphalt pavement unless otherwise called out. This item shall also include the repair of any potholes, driveway transitions, and any other items required to provide a fully functional and successful project in accordance with the project plans and the latest revision of the Missouri Standard Specifications for Highway Construction. 2. Method of Payment: Square Yard. C. Item No. 3 - Wedging Course (section 401): 1. This item shall consist of all labor, equipment and materials associated with the installation of a minimum 1/2" BP-1 leveling/wedging course or in the amount to bring the existing surface to a level grade prior to 2" overlay. This item shall also include the repair of any potholes, pavement transitions, and any and all other items required to provide a fully functional and successful project in accordance with the project plans and the latest revision of the Missouri Standard Specifications for Highway Construction. 2. Method of Payment: Square Yard. D. Item No. 4 - Tack Coat (Section 407): 1. This item shall consist of all labor, equipment, and materials associated with the placement of undiluted tack coat at a rate of 0.10 gallons per square yard. The contractor shall ensure that all materials meet or exceed the material specifications in accordance with the project plans and the latest revision of the Missouri Standard Specifications for Highway Construction. 2. Method of Payment: Gallons. E. Item No. 5 - Traffic Control (Section 616): 1. This item shall consist of all labor, equipment and materials associated with the installation and use of traffic control devices, construction signs, maintenance of moving signs and barricades, flagging. Question Deadline 03/13/2026 Every request for such interpretation should be in writing addressed to Mark Webb with Smith & Co. Engineers at 901 Vine Street, Poplar Bluff, MO 63901 and to be given consideration must be received at least five days prior to the date fixed for the opening of bids.
Award
Roads / Highways
$604,982.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2026
April 17, 2026
County Rd 160 E-10, Doniphan, MO
Related To This Project
Doniphan, MO
Bid Date: Mar 13 2026
Doniphan, MO
Bid Date: Apr 02 2026
Doniphan, MO
Bid Date: May 29 2026
Doniphan, MO
Bid Date: May 29 2026
Doniphan, MO
Bid Date: Jun 08 2026
Doniphan, MO
Bid Date: Mar 03 2026
Doniphan, MO
Bid Date: Mar 04 2026
Doniphan, MO
Bid Date: Jan 23 2026
Doniphan, MO
Bid Date: Sep 16 2020
Doniphan, MO
--
Doniphan, MO
Bid Date: Dec 12 2025
Doniphan, MO
Bid Date: Dec 12 2025
Doniphan, MO
Bid Date: Nov 14 2025
Doniphan, MO
Bid Date: Nov 14 2025
Doniphan, MO
Bid Date: Aug 14 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
