Site work and paving for a bridge / tunnel in South Portland, Maine. Completed plans call for site work for a bridge / tunnel.

The work consists of culvert repairs at three locations. At the Long Creek Culvert at MM 45.90 in the town of South Portland, the work generally consists of constructing two access ways as needed and sliplining the existing 78" reinforced concrete pipe culvert with a 72" liner pipe. At the Unnamed Stream Culvert (MM 57.10) in the town of Cumberland, the work generally consists of parging all joints of the existing 72" reinforced concrete pipe. At the Unnamed Stream Culvert (MM 91.30), in the town of Litchfield, the work generally consists of constructing two access ways as needed, sliplining the existing 60" reinforced concrete pipe culvert with a 54" liner pipe, and removing and replacing the existing culvert headwall. The work also includes maintenance of traffic and all other work incidental thereto in accordance with the Plans and Specifications. Bids will be accepted from Contractors prequalified by the Maine Department of Transportation for Bridge and Highway Construction Projects. All other bids may be rejected. Proposals must be accompanied by an original bid bond, certified or cashier's check payable to the Maine Turnpike Authority in an amount not less than Five (5%) Percent of the Total Amount in the Proposal, but not less than $500.00. The Bidder to whom a Contract is awarded will be required to furnish a Surety Corporation Bond, satisfactory to the Authority, on the standard Contract Bond form of the Authority, for a sum not less than the Total Amount of the Proposal. Proposals must be made upon the Proposal Forms furnished by the Authority separately with the Contract Documents, and must be enclosed in the sealed special addressed envelope provided bearing the name and address of the Bidder, the name of the Contract, and the date and time of Proposal opening on the outside. Surety Corporation Bond - for a sum not less than the Total Amount of the Proposal. All work shall be completed on or before November 30, 2026 Question Deadline 03/03/2026 at 4:00 PM ET The deadline to submit questions online. The deadline to submit questions online. All bid & contractual questions direct to Nate Carll, Purchasing Manager Phone #: (207) 482-8115 Fax: (207) 871-7739 Email: ncarll@maineturnpike.com

Award

Bridges / Tunnels

$1,729,872.00

Public - State/Provincial

Paving, Site Work

38

8

5

9

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
122
Bidding Soon
1,742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2026

April 13, 2026

Project location map

Multiple Locations, South Portland, ME

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.