BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 6, 2026 at 7:00 PM

Updated March 10, 2026

Site work for a mixed-use development in Fillmore, Utah. Completed plans call for site work for a religious / funeral development; and water / sewer project.

Questions Due Date: Mar 2nd 2026, 12:30 PM MST The scope of work involves the Fillmore City Cemetery Booster Pump Skid Upgrade. Submissions are due to 75 West Center, Fillmore, UT 84631. There is a 1GB limit on a single file upload for submissions. Responses must be directed to the designated individual or office as outlined in the solicitation document. It is the responsibility of the vendor to review the entire solicitation to comply with all requirements. PROJECT DESCRIPTION: Fillmore City is replacing an existing pump skid (two 5 HP pumps) with a pump skid consisting of two 10 HP pumps. Cost proposals must include equipment, installation, and start-up. The city will take care of SCADA programming once pumps are installed. Below are the required design parameters: o Available Power: o Single Phase 208/230 V. Phase conversion to occur in Pump VFD panels. No phase converters or additional VFDs allowed. Phase Tech VFDs not allowed. o Existing Pipe Size: o 4" Ductile Iron o Required Flow Rate o 90 GPM @ 220 ft TDH (each pump) o 12.04 ft Net Positive Suction Head Available PROJECT ADMINISTRATION: Bidders should direct questions regarding the proposed project to the Owner's Contact, noted above.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
10
Bidding Soon
56
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 9, 2026

April 1, 2026

Project location map

To be determined, Fillmore, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.