BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Remodeling of an educational facility in Huntingburg, Indiana. Completed plans call for the remodel of a educational facility.

Cedar Crest Intermediate School-2026 Classroom Improvements at Cedar Crest Intermediate School. Electronic media of the Drawings and Specifications in PDF format will be made available for a nonrefundable fee. Copies of the Drawings and Specifications may be obtained upon depositing the specified sum for each set. The deposit will be refunded in full to any bidder or sub-bidder when the Plans and Specifications have been returned within four days after the time set for receiving bids, in good re-usable condition. All mailing costs shall be paid by bidder. A mandatory Pre-Proposal Meeting shall be conducted on-site for all interested Contractors. Question Deadline 03/02/2026 at 4:00 PM Questions on the proposed project should be submitted in written format to Angela Burton (angela@stengroup.com). SCOPE OF WORK: (General Description) Classroom Interior Finishes Improvements (Rooms 505, 507, 509, 511, 611, 609, 607, 605, 603) Also refer to all RFP documents and drawings for entire Scope-of-Work: DEMOLITION / PREP. 1. Removal and disposal of existing carpet, adhesive and transitions complete per new floor finish manufacturer's recommendations. 2. Remove existing vinyl wall base and mastic to expose smooth uniform surface. Note: Carefully remove existing vinyl base and mastic/adhesive without damaging existing wall finish. Damage to any existing wall finish shall be repaired at the expense of the Contractor and to the approval of the Owner's Representative. 3. Clean existing walls free of all existing adhesives, tape residue, etc. Patch and prepare all wall surfaces to smooth uniform surface. 4. Test existing floor substrate for moisture content. Provide and install all required moisture mitigation as required per floor finish manufacturer. NEW WORK 1. All colors and materials shall be submitted for final approval by the Owner prior to installation. Provide physical samples for Owner's approval. 2. Prior to starting any application of new paint finishes, the Contractor shall provide a "mock-up" of the selected paint color on one wall surface at a location in the Work area selected by the Owner for Owner's review and approval. Once approved, this area will be incorporated into the Work. 3. Install new flooring according to the manufacturer's recommendation. Installation of new wall base. 4. Install new wall finishes where indicated. 5. Prep and prepare H.M. door frames for new paint finishes. Apply new paint finishes on interior and exterior of H.M. door frames. 6. Provide new rubber transitions strips where required. All new transition strips shall be secured by the use of epoxy-based adhesive.

Post-Bid

Educational

$2,000,000.00

Public - County

Remodeling

5

10

4

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
75
Bidding Soon
1,072
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

May 26, 2026

Project location map

4770 IN-162, Huntingburg, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.