BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 21, 2026

Site work, new construction and addition to an educational facility in Jackson, Wyoming. Completed plans call for the addition of a educational facility; for the construction of a 600-square-foot educational facility; and for site work for a educational facility.

This project consists of the addition of a secure vestibule to the Jackson Hole High School. Project includes addition of approximately 600sf of new construction with misc. minor renovations occurring as a result of. Work includes site, concrete, structure, mechanical, electrical, plumbing, and various architectural trades. Question Deadline 03/17/2026 The work includes, but not limited to; cast-in-place concrete, rough carpentry, structural steel, steel joists, single-ply membrane roofing, metal wall panels, masonry veneer, plastic-laminated casework, building insulation, joint sealants, doors, windows, door hardware, access control, glazing, non-load-bearing steel framing, gypsum board, acoustical panel ceilings, resilient wall base and accessories, vinyl flooring, exterior paint, interior paint, wood stains, visual display surfaces, signage, roller shades, plumbing, fire alarm, HVAC, data, electrical, other miscellaneous items required to complete work in full and other Work indicated in the Contract Document Bidders and sub-bidders having questions, requiring clarification, interpretation or any RFIs (Request for Information) regarding the procurement documents shall make a written request via email to William Wheatley, AIA at Plan One/Architects at wwheately@planone.com, with a copy to Charlotte Reynolds at creynolds@tcsd.org. Interpretations, corrections, and changes of the contract documents shall be made by Addendum no later than March 17th, 2026

Award

Educational

$1,284,869.00

Public - County

Addition, New Construction, Site Work

37

30

10

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
12
Bidding Soon
198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2026

April 30, 2026

Project location map

1910 High School Rd, Jackson, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.