BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Site work and paving for a mixed-use development in Defiance, Ohio. Completed plans call for site work for a sidewalk / parking lot; road / highway; and water / sewer project.

The scope of the work consists of construction of two single lane roundabouts on Ralston Avenue (SR15) at Anthony Wayne Boulevard and Latchaw Drive. This project includes new sidewalk, curb, pavement markings, signage and storm sewer replacement as needed over a project length of approximately 0.15 miles. Pre-qualification requirements: This work shall be performed by an ODOT Pre-Qualified Contractor. Prequalification status must be in effect at the time of bidding, the time of sale, the time of award and through the life of the construction contract. Each bidder must be registered as a plan holder with the City of Defiance.

Bid Results

Roads / Highways

$3,132,394.00

Public - City

Paving, Site Work

117

8

27

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

May 18, 2026

Project location map

OH-15, Defiance, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.