BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work for an educational facility in Gold Beach, Oregon. Completed plans call for site work for a educational facility.

The work consists of improvements to the existing parking lot at Riley Creek Elementary School. LOCATIONS: Riley Creek Elementary School 94350 Sixth Street Gold Beach, Oregon 97444 All bids must be submitted electronically using the proposal forms provided. The subject line must read: "CCSD - RILEY CREEK ELEMENTARY SCHOOL PARKING LOT PROJECT" and include the name of the bidder. Each bid must include an unconditional cashier's check, certified check, or surety bond in the amount of ten percent (10%). Unsuccessful bidders will have their security refunded when the contract has been awarded. All objections or comments regarding the bid specifications must be submitted in writing at least seven (7) calendar days before the bid closing date. No bid will be received or considered unless the bidder is licensed by the Construction Contractors Board of the State of Oregon. Each bid must also indicate whether the bidder is an Oregon resident bidder. Compliance with ORS 279C.370 regarding submission of the First-Tier Subcontractor Disclosure Form is required if the contract amount exceeds $100,000, and this form must be submitted either with the bid or within two hours after bid closing. The Central Curry School District reserves the right to reject any or all bids, waive formalities, and postpone the award for sixty (60) days. All bids and quoted prices must remain firm for sixty (60) days after the bid closing date. Project start date June 17, 2026. Contract must meet a Substantial Completion date of August 28, 2026 Question Deadline 03/03/2026 If any person contemplating submitting a bid for the proposed contract finds discrepancies in, or omission from, or is in doubt as to the true meaning of any part of the drawings, specifications or form of contract documents, they may submit to the Owner's Project Manager a written request for an interpretation thereof to be received in the office of the Owner's Project Manager no later than SEVEN (7) calendar days before bid, before 2:00 PM local time. The person submitting the request will be

Post-Bid

Educational

$300,000.00

Public - County

Site Work

25

12

19

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
14
Bidding Soon
126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

June 17, 2026

Project location map

94350 6th St, Gold Beach, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.