Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 12, 2026 at 8:00 PM
Updated May 20, 2026
Site work and paving for a road / highway in Charles City, Iowa. Completed plans call for site work for a road / highway.
The scope of work involves furnishing labor, equipment, and new materials for the construction of the 2026 Iowa Lane Streets Intersection Improvement Project. Major construction items include approximately: 175 cubic yards of excavation, 290 square yards of pavement removal, 250 tons of modified subbase, 150 linear feet of 8" water main, one fire hydrant assembly, an 8" gate valve with box, an 8" gate valve with live tap, 540 square yards of 7" PCC street pavement, two urban road closures, 22 square feet of signs, 20 linear feet of perforated square steel tube post and anchor, 9,500 square feet of topsoiling and seeding, as well as lump sum items for construction layout and surveying, temporary traffic control, mobilization, and railroad protective insurance. The final scope will be determined by the City Council at the time of award based on the selected option. Proposals must be submitted on the provided form from the City Engineer and placed in a sealed envelope, accompanied by a bid security of 10% of the bid amount, which can be in the form of a certified check, cashier's check, certified share draft, or bid bond as specified. The bid security must be unconditional and is subject to forfeiture if the successful bidder fails or refuses to enter into contract within ten days after award and post a satisfactory bond. Bids cannot be withdrawn for thirty days after opening. Preference is given to Iowa products and labor. The City reserves the right to reject any or all bids and to waive technicalities. Work shall begin after substantial completion of the referenced Brackett Street project and must be completed on or before the specified project completion date. Bid Result OPTION 1 - DEAD END Popp Excavating $95,451 OPTION 2 - One Lane Connection Popp Excavating $123,066.
Award
Roads / Highways
$218,517.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2026
April 13, 2026
To be determined, Charles City, IA
Related To This Project
Charles City, IA
Bid Date: Mar 12 2026
Charles City, IA
Bid Date: Apr 23 2026
Charles City, IA
Bid Date: Apr 22 2026
Charles City, IA
Bid Date: Jun 09 2026
Charles City, IA
--
Charles City, IA
--
Charles City, IA
--
Charles City, IA
--
Charles City, IA
--
Charles City, IA
Bid Date: Nov 18 2025
Charles City, IA
Bid Date: Oct 30 2025
Charles City, IA
Bid Date: Jun 02 2020
Charles City, IA
Bid Date: May 01 2025
Charles City, IA
Bid Date: Mar 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
