Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 27, 2026 at 8:00 PM
Updated March 28, 2026
Site work for a civil project in Coldwater, Ontario. Conceptual plans call for site work for a water / sewer project; and water / sewer project.
Severn is requesting proposals from qualified consulting engineering firms to provide professional engineering design, approvals, tendering, and provisional contract administration services for the Coldwater Wastewater Treatment Plant (WWTP) and Main Sewage Pumping Station (SPS) Expansion. The Coldwater WWTP currently operates at a rated average day capacity of 921 m3/day and requires expansion to 1,500 m3/day as Phase 1 to accommodate forecasted growth within the Coldwater community and to ensure continued compliance with effluent objectives established through the Municipal Class Environmental Assessment, Environmental Study Report, and Receiving Water Assessment. Question Deadline 03/12/2026 at 4:00 PM ET TIMELINE: Request for Proposals (RFP) for consulting engineers has been issued and extended by the owner. Submissions are under review. All necessary permits and approvals are to be construction tender ready no later than July 19, 2027. It has yet to be determined if the WWTP and the SPS will be tendered separately. Further update upon award of the RFP.
Conceptual
Water / Sewer
$8,000,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2026
September 10, 2027
1130 Upper Big Chute Rd, Coldwater, ON
Related To This Project
Coldwater, ON
Bid Date: Feb 05 2026
Coldwater, ON
Bid Date: Mar 25 2019
Coldwater, ON
Bid Date: Oct 09 2025
Coldwater, ON
Bid Date: Jul 09 2025
Coldwater, ON
Bid Date: Apr 23 2025
Coldwater, ON
Bid Date: Oct 10 2024
Coldwater, ON
Bid Date: Aug 14 2024
Coldwater, ON
Bid Date: Jun 20 2024
Coldwater, ON
Bid Date: May 17 2024
Coldwater, ON
Bid Date: May 09 2024
Coldwater, ON
Bid Date: Feb 22 2024
Coldwater, ON
Bid Date: Sep 18 2023
Coldwater, ON
Bid Date: Aug 24 2023
Coldwater, ON
Bid Date: Jul 20 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
