BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 23, 2026 at 8:00 PM

Updated March 24, 2026

Site work for a sidewalk / parking lot in Essex Junction, Vermont. Completed plans call for site work for a sidewalk / parking lot.

The contract generally includes the following work items on Main Street in the City of Essex Junction: supply and install 850 square yards of 4-inch thick new cement concrete sidewalk; supply and install 200 square yards of 6-inch thick new cement concrete sidewalk; supply and install 515 linear feet of 4-inch perforated SDR 35 PVC pipe; supply and install 4 Nyloplast drain basins or approved equal; supply and install 100 square feet of detectable warning surface; supply and install 350 cubic yards of plant mixed gravel; supply and install 100 cubic yards of topsoil; supply and install 750 square yards of lawn area restoration. All work will be in accordance with drawings, specifications and other contract documents and information prepared by the City of Essex Junction. Sealed bids will be received at the City of Essex Junction offices until 2:00 p.m. on March 18, 2026. Digital drawings, specifications, and other contract documents may be obtained by emailing the consulting engineer. Prospective bidders will be added to the Plan Holder List and provided access to a digital Sharepoint site with all relevant project information. Prospective bidders must be on the Plan Holder List to be eligible to submit a bid. Each bid must be accompanied by a bid guaranty of at least five percent (5%) of the bid amount, payable to the City of Essex Junction. The acceptable form for a bid guaranty is either a bid bond or certified check. The contractor must complete all work between June 01, 2026 and October 02, 2026. The owner reserves the right to waive informalities and to reject any or all bids. Drawings or Specifications, a written request (via email) for an interpretation or correction thereof may be submitted to Jeffrey P. Kershner, P.E., President, Donald L. Hamlin Consulting Engineers, Inc. at jkershner@dlhce.com up to seven (7) calendar days prior to the Bid Date indicated in Item 1. Question Deadline 03/11/2026

Award

Sidewalks / Parking Lot

$274,975.00

Public - City

Site Work

20

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
474
Active Projects
263
Bidding Soon
3,229
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

June 1, 2026

Project location map

Main St, Essex Junction, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.