BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2026 at 8:00 PM

Updated March 27, 2026

Site work and paving for a bridge / tunnel in Smiths Falls, Ontario. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Rehabilitation of Fallbrook Bridge (B6), which is a reinforced concrete box beam bridge spanning over the Fall River (23.85m), and Playfairville Bridge (B13), which is a slab on pre-stressed girders bridge spanning the Mississippi River (43.47m). TIMELINE: Request for Proposals (RFP) for engineering services was issued by the Owner. Further update upon award of the RFP. Fallbrook Bridge estimate is $1,034,000. Playfairville Bridge estimate is $1,068,000.

Conceptual

Bridges / Tunnels

$2,102,000.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2026

Project location map

Multiple Locations, Smiths Falls, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.