Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 26, 2026 at 8:00 PM
Updated May 27, 2026
Demolition, site work and paving for a mixed-use development in Alcoa, Tennessee. Completed plans call for the demolition of a transportation facility; and transportation facility.
MKAA PROJECT NO. AIP 3-47-0037-091-2026 The work includes, but is not limited to, the furnishing of all labor, materials, equipment, incidentals, and tools, and miscellaneous services required for the construction and completion of the Project; and submission of materialsubmittals, forms, applications, equipment warranties/registration and other documents, as required by applicable regulatory authorities. The project is the third in a series of efforts to rehabilitate Runway 5R-23L. The scope includes rehabilitation of Taxiway A7, relocation of Taxiway R5, and construction of Taxiway Y. General work elements include: 1. Demolition 2. Grading and Drainage 3. Temporary and Permanent Erosion & Sediment Control Measures 4. Airfield Pavements 5. Duct Banks and Conduits 6. Airfield Electrical and Cabling 7. Airfield Signage 8. Pavement Markings 9. Other Miscellaneous Items Bidders are required to furnish all labor, materials, equipment, incidentals, tools, and miscellaneous services required for the construction and completion of the project, as well as the submission of material submittals, forms, applications, equipment warranties/registration, and other documents as required by applicable regulatory authorities. Bids must be submitted by the stated deadline via BidNet Direct. Paper bids will not be accepted. All work must be performed in strict accordance with the contract documents.
Post-Bid
Transportation Terminals
$20,000,000.00
Public - City
Demolition, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2026
June 1, 2026
To be determined, Alcoa, TN
Related To This Project
Alcoa, TN
--
Alcoa, TN
Bid Date: Mar 23 2026
Alcoa, TN
Bid Date: Mar 10 2026
Alcoa, TN
Bid Date: May 21 2026
Alcoa, TN
Bid Date: May 26 2026
Alcoa, TN
Bid Date: May 26 2026
Alcoa, TN
Bid Date: May 19 2026
Alcoa, TN
Bid Date: May 19 2026
Alcoa, TN
Bid Date: Feb 26 2026
Alcoa, TN
Bid Date: Feb 13 2026
Alcoa, TN
Bid Date: Feb 13 2026
Alcoa, TN
Bid Date: Feb 11 2026
Alcoa, TN
Bid Date: Jan 14 2026
Alcoa, TN
Bid Date: Feb 05 2026
Alcoa, TN
Bid Date: Feb 13 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
