Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 25, 2026 at 7:00 PM

Updated March 7, 2026

Renovation of an educational facility in Fulton, Missouri. Completed plans call for the renovation of a educational facility.

The scope of work includes, but is not limited to: - Removal and proper disposal of one (1) existing 20-ton York rooftop HVAC unit. - Furnish and installation of one (1) new 20-ton rooftop HVAC unit of equal or greater efficiency. - New unit must meet or exceed current federal, state, and local energy efficiency standards. - Replacement of the existing curb. - Connection to existing ductwork, gas, and electrical service. - Replacement or upgrade of the electrical disconnect (if required). - Start-up, testing, and commissioning of the unit. - Verification of proper airflow, refrigerant charge, and system operation. - Coordination with school personnel to minimize disruption. - Removal and disposal of all debris and materials. - Provide manufacturer warranty and contractor labor warranty documentation The removal and replacement of one (1) existing 20-ton York rooftop HVAC unit at Bush Elementary School . Questions should be directed to Tim Echelmeier, Director of Operations, at techelmeier@fulton58.org.

Post-Bid

Educational

$500,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
48
Bidding Soon
871
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2026

April 6, 2026

Project location map

908 Wood St, Fulton, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed