BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2026 at 8:00 PM

Updated May 21, 2026

Site work and new construction of a detention facility in Oroville, California. Completed plans call for site work for a detention facility; and for the construction of a 26,620-square-foot, two-story above grade detention facility.

As of May 04, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. The County of Butte Department of General Services is soliciting for a new Probation Building. The project consists of, but not limited to the demolition of the existing 24,671 square foot Probation Building and the new construction of a 26,620 square foot office law enforcement building for the Butte County Probation Department. The two-story law enforcement facility is constructed of C.M.U. walls along with steel stud framed walls. The floor system is concrete over metal deck over open web steel trusses. Project time line is 18 months from the issuance of the Notice to Proceed. Final Date to Submit Questions and Requests for Clarification/Information: March 10, 2026 by 5:00 PM (PST) Questions Answered via Addendum(s) by: March 17, 2026 by 5:00 PM (PST) Question Syndee Howerton, Contracts/Procurement Agent 530.552.3500 Showerton@buttecounty.net Only those bidders determined to be pre-qualified through that solicitation are eligible to submit a bid and be considered for award. A cashiers check or Bid Bond in the amount of ten percent (10%) of the amount of the bid price shall be submitted with the bid as evidence of good faith that the Bidder, if successful, will enter into a Contract satisfactory to the County. The successful bidder, in addition thereto, will furnish Surety Bonds in the amount of one hundred percent (100%) of the bid covering payment of labor and materials, and one hundred percent (100%) of the bid covering faithful performance. The Board of Supervisors of the County of Butte reserves the right to reject any or all bids or alternate bids deemed not advantageous to the County of Butte, and to waive any informality in any bid received. The award, if made, will be executed within forty-five (45) calendar days after opening of bids.

Bid Results

Jails / Prisons

$13,216,610.00

Public - County

New Construction, Site Work

171

36

41

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
105
Bidding Soon
1,220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2026

June 1, 2026

Project location map

42 County Center Dr, Oroville, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.