Published March 27, 2026 at 8:00 PM

Updated March 28, 2026

Site work for a water / sewer project in Coffman Cove, Alaska. Working plans call for site work for a water / sewer project.

**As of March 23, 2026, bids were canceled. No definite date for the rebid.** The contractor shall construct electrical improvements in the water treatment plant in Coffman Cove, Alaska. Bidders must furnish all labor, equipment, and materials and perform all work as outlined. Bidders must contact the procurement officer to receive technical specifications and IFC drawings. The apparent successful bidder must furnish a payment bond and a performance bond, each in the amount of 100% of the contract. The successful bidder must execute the contract and bonds within fifteen calendar days after notification of bid acceptance, or within any extended period allowed in writing by the Contracting Officer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Engineer's Estimate is between $100,000 and $200,000 The contractor shall complete all labor, materials, equipment, and services necessary to complete the electrical work associated with the water treatment system upgrades, as shown in the contract drawings and specifications. Work shall include, but is not limited to, the following: Installation of all electrical wiring, conduit, and supports Power and control termination for new equipment Modifications to existing electrical panels as required Electrical connections and hookups for all new treatment equipment Grounding and bonding in accordance with applicable codes and standards Integration of new equipment with the existing facility power system. The contractor shall coordinate closely with the controls/instrumentation vendor to ensure compatibility and proper interfaces. The contractor shall be responsible for functional testing and supporting startup/commissioning. All questions shall be addressed in writing and directed to the Procurement Officer. The deadline for submission of questions is 10 days prior to the ITB deadline. This will allow time for an addendum to be issued if one is required. It will also help prevent the opening of a defective proposal. No questions other than written shall be accepted and no response other than written will be binding upon VSW, an addendum will be published and issued to all offerors by email. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Final Planning

Water / Sewer

$200,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
16
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2026

September 23, 2026

Project location map

To be determined, Coffman Cove, AK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.