Published April 3, 2026 at 8:00 PM

Updated April 4, 2026

Site work and new construction of a pre-engineered storage facility in Tupelo, Mississippi. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The project consists of furnishing all labor and materials for the construction of the "FIRE STATION NO. 5 - METAL BUILDING / SHED" at the new location for Fire Station No. 5 on S. Green St. within the City of Tupelo, Mississippi. Scope of work includes the fabrication, delivery, and erection of the metal building, installation of doors, electrical work, gutters, and all related improvements as defined in the contract documents. Excavation required for the building pad and concrete slab will be constructed by the Owner and is not included in this contract. All necessary labor, materials, equipment, and incidentals must be provided to complete the improvements as detailed in the Proposal document and the General Conditions of Work and Technical Specifications in the Contract Documents. Instructions to bidders include that bids must be submitted sealed or electronically through the designated site, with the award being made to the lowest and best bidder. The City of Tupelo reserves the right to reject any and all bids and to waive any informalities. LOCATION: 2603 South Green St. Tupelo, MS 38801 The total Contract Time shall not exceed 100 consecutive calendar days. The Contractor shall be required to provide and install a 75 ft x 80 ft pre-engineered metal building and all related roofing, siding, doors, electrical service, conduits, lighting, outlets, etc. as required to provide a finished and useable building / storage building to the Tupelo Fire Department. Upon award of the contract, the Contractor shall submit a set of drawings for the pre-engineered metal building that is stamped by a licensed professional engineer registered in the State of Mississippi. The building design shall include the following parameters: o 75' x 80' building with 3 bays @ 25' wide by 80' deep o 1 bay (northernmost bay) shall be fully enclosed and insulated o Non-enclosed area (50' x 80') shall include 3/4 height non-insulated metal siding on back and side o Eve Height = 19' - 0" o Roof Slope = 3:12 o Bracing: Cable Diagonal Bracing o Building Code: IBC 2018 o Roof Live Load: 20 psf (Reducible Per Code); Roof Snow Load: 10 psf; Collateral Load: 3 psf o Wind Velocity: 109 mph / Exposure C

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$219,310.00

Public - City

New Construction, Site Work

5

10

2

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
71
Bidding Soon
728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

April 8, 2026

Project location map

2603 S Green St, Tupelo, MS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.